Laserfiche WebLink
SUMMIT ENGINEERING C 0 1 ENGINEERS & LAND SURVEYORS <br /> Mail: P.O. Box 1897 Alamosa, CO 81101 P: 719-589-6147 E: summitengco@gmail.com <br /> • The site will be seeded immediately after mining has been completed, but <br /> in such a way that germinated seed will have time to grow prior to freezing <br /> weather. The seed bed will be disced and harrowed to eliminate <br /> compacted conditions. <br /> • The seed mixture is specified by the NRCS and is expected to be readily <br /> available in quantity from Arkansas Valley Seed Company as typical <br /> reclamation mix for the dry areas of the San Luis Valley. A mixture is <br /> enclosed with this exhibit. <br /> • The seed mixture will be broadcast with a utility vehicle towing a PTO <br /> (power take-off) driven broadcaster. <br /> • The mulch-seed mixture will be crimped into the soil with grousers on the <br /> tracks of a small dozer. No fertilization is anticipated or proposed for the <br /> seeding process. <br /> • We do not anticipate the planting any trees or shrubs unless <br /> recommended by the NRCS. If so, we will establish small trees as <br /> recommended by the NRCS, probably the type used for windbreaks that <br /> will be planted with gel bags during the early spring months or early fall. <br /> e) No ponds, streams, roads, or buildings will be excavated or constructed for this <br /> operation. <br /> f) No waste reclamation treatment is anticipated. There will be no underground <br /> mining, or sediment control facilities for this mining operation. <br /> Job # 1200710MP - C Pagel 19of79 <br />