Laserfiche WebLink
SCHOEN FARM IMPROVEMENT PROJECT <br /> Notes and Explanation <br /> The County Conditional Use Permit (2 pages)was applied for and approved under the assumption that <br /> at least the Sand and Gravel Yard (processing plant and stockpile area)would require obtaining a DRMS <br /> Reclamation Permit. <br /> The BOCC has indicated informally that they would recognize a letter from DRMS stating that the <br /> proposed activity would NOT require a reclamation permit, or that only the Sand and Gravel Yard and its <br /> access road to County Road 15,would require a reclamation permit, as meeting the conditions of the <br /> CUP. The 7.74-acre size in the CUP was only the Sand and Gravel Yard itself, and did not include the 1.12 <br /> acres of the access road,from the Yard to CR-15, which was approved by the BOCC. <br /> The speed of progress in the Improvement Project is entirely dependent on the funding available both <br /> for collecting the rock from the surface and installing the upgraded irrigation system, and the BOCC CUP <br /> authorizes up to 15 years.While it is not expected the work would take that long,various things can <br /> delay the work. The landowner and operator will keep the County informed on a regular and timely <br /> basis. <br />