Laserfiche WebLink
Percentages <br /> State o Federal o Local Agency o <br /> 17. What post mining land uses will be made of the extraction and why? (This <br /> question helps us determine the intent of the activity.) <br /> The extractuan 2rea 1A ill be cropland and pastureland. <br /> Irrigation Will he converted to pivot sprinker Water 'ones f ON the converted <br /> 6 rrigation system may be installed as rock is cleared from the surface <br /> 18. What types and sizes of equipment will be used in the extraction? <br /> Stanrlgrd rnnstnirtion PgijipmPnt• front-Pnd Inartars iip to 1OK ra d small (ii ton 1 <br /> CY buckets with bars/screen) backhoes (tracked or wheeled).Small tandem dump <br /> trucks or trailers pulled by tractors/pickups may be used to transport collected rock <br /> rom more distant areas of the parcel tote pre-processing stockpiles at the plant site. <br /> Standard dump trucks (tandem or semi)will haul material off-site. <br /> Please send the completed questionnaire to the Division at the address above for review. <br /> The Board has directed the Division to make a decision based on the information you have <br /> supplied. We trust that the activities will be performed as represented. If we receive a <br /> complaint, we are required by law to conduct an inspection of the site. Which could result <br /> in a violation, a cease and desist order, and other corrective actions including submittal of <br /> a permit application. <br /> If you have any questions, please contact the Division at (303)866-3567. Please feel free <br /> to visit our web site at: https://colorado.gov/drms for further access to the full Act and <br /> Rules governing extraction of metals, non-metals, and construction materials in the State <br /> of Colorado. <br /> Sincerely, <br /> Division of Reclamation, Mining and Safety Staff <br /> Enclosure: Rule 1.2 excerpt for Hard Rock Metal Mines and Construction Materials <br /> Rule 1.2 excerpt for Hard Rock/Metal Mining <br /> Page 4 of 6 <br />