My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-19_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2020-11-19_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2024 8:47:13 AM
Creation date
12/8/2020 8:10:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
11/19/2020
Doc Name
2.05-50 Thru 2.05-88
Section_Exhibit Name
2.05.4 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br />Table 36 Approximate Topsoil Stockpile Volumes for West Elk Mine Site <br />Destination Upon Maximum Actual9 <br />Location/Name5,10 Reclamation Storage (c.y.) Storage (c.y.) <br />TOPSOIL STOCKPILES <br />• Main Mine Site & Lone Pine Gulch <br />• Main Stockpile <br />• Materials Storage Bench Stockpile <br />• Water Tank Stockpile <br />• Parking Lot Stockpile <br />• Lone Pine Gulch Stockpile <br />• Topsoil Stockpile #5 <br />• North Soil Storage Area (NSSA) <br />• Lower Refuse Pile (LRP) Stockpile <br />• Refuse Pile Expansion (RPE) Stockpile <br />• Sylvester Gulch Facilities Area6 <br />• Shafts Site Stockpile <br />• Topsoil Stockpile #1 <br />• Topsoil Stockpile #3 <br />• Power Pole 9 <br />• Power Pole 11 <br />• Power Pole 12 <br />• Power Pole 13 <br />• Power Pole 14 <br />• Power Pole 16 <br />SUBSOIL STOCKPILES <br />• Main Mine Site & Lone Pine Gulch <br />• Lone Pine Gulch Stockpile (Staging Area) <br />• Sylvester Gulch Facilities Area <br />• Live Subsoil Stockpile #1 <br />• Live Subsoil Stockpile #2 <br />Main Mine Site <br />--- <br />84,800' <br />Materials Storage Bench (MSB) --- <br />11,000 <br />1998 ROM Expansion <br />53,000 <br />6,200 <br />Parking Lot Expansion <br />--- <br />250 <br />Lone Pine Substation & Fan <br />--- <br />02,11 <br />1997 MSB Expansion <br />20,500 <br />? <br />Lower Refuse Pile <br />--- <br />19,4003 <br />Refuse Pile Expansion <br />--- <br />16,4058 <br />Shaft Site <br />50,000 <br />49,9006 <br />Dewatering Facility <br />18,650 <br />18,0006 <br />35,710 <br />35,7106 <br />Pole 9 Road <br />25 <br />Pole 11 Road <br />180 <br />Pole 12 Road <br />50 <br />Pole 13 Road <br />45 <br />Pole 14 Road <br />140 <br />Pole 16 Road <br />30 <br />Lone Pine Gulch Fan <br />--- <br />011 <br />Lower Refuse Pile & Various <br />58,000 <br />Varies4,7 <br />Various <br />15,200 <br />Varies' <br />Notes: <br />1. Volume calculated by Envirocon, Inc. Based on the 1993 topsoil pile relocation designs and utilizing original (1996) <br />contours and contour survey of the pile conducted in 1993 by Messenger & Associates. <br />2. Reclaimed, but had included approximately 400 c.y. at the Lone Pine substation and approximately 3,500 c.y. for the <br />Lone Pine mine water treatment pond. (Not Constructed) <br />3. Volume calculated following LRP reconfiguration (TR78), July 1996. <br />4. Approximately 13,270 c.y. will be kept in Stockpile at all times for reclamation at Lower Refuse Pile <br />5. For topsoil and subsoil stockpile locations, see Map 53, 53A, and 53B <br />6. As -Built volumes from Nielson's Topographic Survey (Nov. 1997). <br />7. The volume of Live Subsoil Stockpiles will vary as soil is added to and removed from the pile for construction projects. <br />Soil is not needed for reclamation, other than as noted in Footnote 4. <br />8. Actual storage volumes will vary depending on the phase of construction and reclamation of the RPE area. See Table 1 in <br />Exhibit 70, which details the amount of soil that is stripped during each phase. <br />9. Unless otherwise specified, actual storage volumes have been estimated as of August 1998. <br />10. Stockpiles for methane drainage well sites are not included. <br />11. The Lone Pine facilities area has been reclaimed and the area has obtained partial bond release. <br />2.05-52 Revised Jul. 1996 MR190; Revised Nov. 1996 PR07; Revised Jan. 1997 TR79; <br />Revised Jul. 1997 TR81; Revised Sep. 1997 MR225; Revised Oct. 1998 TR86; Revised Mar. 2009 TRI 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.