EXHIBIT L <br /> RECLAMATION COSTS <br /> The following Reclamation Cost Estimate is based on the <br /> assumption that there will be no more than 25 . 00 acres ± distur- <br /> bance at any-one time. The mine working face will be 900 feet long <br /> by 20 feet high and be cut/fill sloped. An addition 400 feet of <br /> slope will need to be backfill sloped. When it comes time to <br /> resoil the area, an average of 5 inches of soil would be spread <br /> over the disturbed area. At that time we will have to respread <br /> 16, 805 cubic yards of topsoil and move 3, 333 cy of cut\fill slop- <br /> ing. The backfill sloping and shaping on the exterior slopes <br /> needing 7, 115 cubic yards of material. The table below outlines <br /> the various areas of disturbance at the time explained above. A <br /> D8N is used to do the shaping and resoiling in this calculation and <br /> the mobilization haul distance is 9.25 miles . The revegetation <br /> cost figure used includes fertilizer, grass seed, labor and drill- <br /> ing costs . <br /> STAGE TOTAL SOIL DEPTH <br /> NEEDING RESOILING 25.00 5 <br /> REVEGETATION AREA 25.00 <br /> RESOIL @ 51' 1 6,805 CUBIC YARDS <br /> CUT/FILL SLOPING 3,333 CUBIC YARDS <br /> BACKFILL SLOPING 7, 1 1 5 CUBIC YARDS <br /> ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br /> Unit Cost <br /> 1. Revegetation areas includes grass seed, fertilizer <br /> and labor to drill . . . . . . . . . . . . . . . . . $ 356.19/AC. <br /> 2. Re-spreading soil and/or growth media with <br /> D-8 cat push distance 200 ft or less . . . . . . . . . . . . $ 0.471/YD3 1i <br /> 3. Cut/fill working face 400 feet long by 20 feet high <br /> D-8 cat push distance 60 ft or less . . . . . . $ 0.255/YD3 11 <br /> 4. Backfill and shape 400 feet long by 20 feet high <br /> 988H Frontend Loader haul distance 900 ft or less . . . . . . $ 0.946/YD3 1' <br /> 5. Dust control 1 - Water tanker 2500 gal . . . . . . . . . $ 52.61/hr <br /> 6. Shape seedbed Cat 140M motor grader at 1.3 acres per hour . . . $ 81. 94/AC 1' <br /> 7. Rip compacted area Cat 140M motor grader at 1.17 acres per hour $ 90.79/AC 1' <br /> RECLAMATION COSTS <br /> 1. Revegetation, 25.22 ac @ $356.19/ac $8, 904.75 <br /> la. Secondary revegetation 25.00 ac * 50% @ $356.19/ac 4,452.38 <br /> 2. Resoiling, 16, 805 yd3 @ 47.14/yd3 7, 917.17 <br /> 3. Cut/fill highwall 3, 333 yd3 *1.25 @ 25.5C/yd3 1, 062.49 <br /> 4 . Backfill slope 7, 115 yd3 @ 94.60/yd3 6,730.17 <br /> 5. Dust control 40 hrs @ $52.61/hr. 2,104.40 <br /> 6. Shape seed bed 25.0 acres @ $81. 94/ ac 2, 048.54 <br /> 7. Rip compacted area 20.0 ac @ $90.79/ac 1,815.17 <br /> Net Total $35,035.68 <br /> 6. Indirect costs <br /> Mobilization 3, 487.22 <br /> Insurance, Bond, Management& Profit 8,709.12 <br /> 7. Administration costs 2, 861. 60 <br /> TOTAL ESTIMATE $50, 093.62 <br /> Recommend bond remain set at$50,500.00 <br /> W56- Hribar Pit Amendment December 2020 <br /> 63 <br />