My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-07_REVISION - M2009027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009027
>
2020-12-07_REVISION - M2009027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 5:19:37 AM
Creation date
12/8/2020 8:02:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009027
IBM Index Class Name
REVISION
Doc Date
12/7/2020
Doc Name
Request For Amendment To Permit
From
The Walsenburg Sand and Gravel Company
To
DRMS
Type & Sequence
AM1
Email Name
JPL
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN EXHIBIT E(CONT) <br /> RECLAMATION TIMETABLE <br /> Reclamation will begin once enough area has been opened so <br /> that any reclamation completed will not be disturbed as mining <br /> progresses . This may take 5 or more years depending on the <br /> economic conditions in the area and the amount of material mined. <br /> The operator anticipates approximately 60% of the total mined <br /> land will be reclaimed by the time mining is completed. A por- <br /> tion of the floor area will be complete, but the area under the <br /> plant site/stockpile area will still need work and grading of the <br /> reclaiming the final face area will be the last area to be re- <br /> claimed. Shortly after mining ends and the stockpiles have been <br /> removed, all resoiling and revegetation will be complete. The <br /> area will then be monitored for success of revegetation until it <br /> is released by the Board. The operator estimates that this will <br /> happen 3 to 5 years after mining is completed. <br /> If revegetation problems occur before release, an analysis <br /> of the site will be made and the area will be revegetated again <br /> as necessary. The seed mixture and rates may be revised as <br /> needed to complete reclamation, if a modification is required, <br /> the Division will be notified prior to making the change. This <br /> gives us the most flexibility to complete reclamation success- <br /> fully. <br /> RECLAMATION TIMETABLE <br /> Acres ± <br /> Option Years Total Revegetation Road Undisturbed <br /> Area <br /> #1 3-5 46. 91 41 . 74 0 . 09 5 . 08 <br /> 4 <br /> W56- Hribur Pit Amendment December 2020 <br /> 20 <br />