Laserfiche WebLink
OVERBANK <br /> (VARIES - SEE DT02) <br /> TOP OF BANKFULL <br /> (VARIES - SEE DT02) <br /> TOP OF LOW FLOW <br /> (VARIES - SEE DT02) <br /> UPLAND SEED MIX RIPARIAN SEED MIX RIPARIAN SEED MIX UPLAND SEED MIX <br /> PLACED TO LIMITS PLACED FROM PLACED FROM PLACED TO LIMITS <br /> OF DISTURBANCE TOP OF LOW FLOW TOP OF LOW FLOW OF DISTURBANCE <br /> TO OVERBANK INSTALL INSTALL TO OVERBANK <br /> WILLOW WILLOW <br /> CUTTINGS ON CUTTINGS ON _ <br /> BANKFULL BANKFULL — <br /> _ _ BENCH — BENCH <br /> COMPACTED O <br /> TOPSOIL (6" MIN.) SUBSTRATE MATERIAL _ TOPSOIL (6" MIN.) <br /> WITHOUT FINES <br /> INSTALLED TO LIMITS INSTALLED TO LIMITS <br /> OF DISTURBANCE (6" THICK MIN.) — OF DISTURBANCE <br /> O O O O <br /> 6 BENTONITE <br /> BY OTHERS <br /> EROSION CONTROL BLANKET NEDIA SC400B COMPACTED SUBSTRATE MATERIAL TO EROSION CONTROL BLANKET NEDIA SC400B <br /> WITH STRAW AND COCONUT FIBER BE INSTALLED TO OVERBANK LIMITS WITH STRAW AND COCONUT FIBER <br /> MATRIX OR APPROVED EQUIVALENT (TYP.) (24" THICK MIN.) MATRIX OR APPROVED EQUIVALENT (TYP.) <br /> TYPICAL CHANNEL SECTI (DN- <br /> NOT TO SCALE <br /> TABLE 1 . STREAM SUBSTRATE PROPORTIONS STREAM SUBSTRATE PLACEMENT AND GRADATION NOTES: <br /> 1. WHERE STREAM SUBSTRATE IS DESIGNATED ON THE RESTORATION PLAN, COBBLE MATERIAL (WHICH <br /> Approximate Proportions Material Material Description TABLE 2. COBBLE GRADATION MEETS THE GRADATION SHOWN IN TABLE 2) SHALL BE MIXED WITH SMALLER MATERIAL AND FINES TO <br /> (loader buckets) Type MEET THE PROPORTIONS LISTED IN TABLE 1 TO FILL ALL REMAINING VOIDS. <br /> 6 Cobble See Table 2. 2. THE MIX PROPORTIONS PROVIDED IN THESE TABLE ARE APPROXIMATE AND ARE SUBJECT TO <br /> INTERMEDIATE ADJUSTMENT BY THE ENGINEER. THE INTENT OF THE SPECIFIED STREAM SUBSTRATE MATERIAL IS TO <br /> material that <br /> 1 Vold-fill 2 to is well-graded, 100%passing 6-inch sieve,4-inch cobble (round washed river rock THAN GIVEN 50 <br /> o/° SMALLER ROCK D MATCH THE EXISTING STREAM SUBSTRATE OF THE DOWNSTREAM CHANNEL. <br /> 35-50% passing 3-inch sieve, 5-20% passing DIMENSION (INCHES) 3. THE STREAM SUBSTRATE MATERIAL SHALL BE STOCKPILED AND THOROUGHLY MIXED PRIOR TO <br /> 2-inch sieve) SIZE BY WEIGHT (INCHES) PLACEMENT AND SHALL BE INSTALLED AND COMPACTED SO THAT A DENSE, INTERLOCKED LAYER OF <br /> z 1 Void-fill 4-inch minus pit run surge (round river rock MATERIAL IS PROVIDED WITH VOIDS COMPLETELY FILLED. COMPACTION OF THE STREAM SUBSTRATE <br /> material and sand, well graded, 90-100%passing 4-inch 70 - 100 15 SHALL BE DONE USING HEAVY EQUIPMENT (E.G. BUCKET OF AN EXCAVATOR). <br /> N sieve, 70-80% passing 1.5-inch sieve, 40-60% 50 - 70 12 9 4. WHERE INDICATED ON THE DRAWINGS, A SURFACE LAYER OF STREAM SUBSTRATE WITHOUT FINES SHALL <br /> Q passing 3/8-inch sieve, 10-30% passing #16 35 - 50 9 BE PLACED AND COMPACTED, CONSISTENT WITH THE 'TOP-DRESS' MATERIAL INCLUDED IN TABLE 1. <br /> 1 Void-fill Typesieve)II bedding 2 - 10 3 5. ALL STREAM SUBSTRATE SHALL BE COMPACTED AND REVIEWED AND APPROVED BY THE ENGINEER PRIOR <br /> material NOTE: MIX ON SITE AND PRIOR TO PLACEMENT TO ANY REVEGETATION. <br /> o % to 1 Void-fill Native topsoil <br /> o material <br /> wTop layer Top Additional 4 to 12-inch cobbles (round washed <br /> dressing river rock that is well graded, 80-100%passing <br /> w12-inch sieve, 35-50% passing 6-inch sieve, 5- <br /> 20%passing 4-inch sieve) shall be mixed in on <br /> the surface of exposed sections of void-filled <br /> riprap (covering approximately 15% of the <br /> of surface) prior to compaction of the void-filled <br /> 0 riprap. Cobbles shall be fully embedded into <br /> o the mass of the void-filled ri ra . <br /> Q <br /> j Note: Mix proportions and material gradations are approximate and are subject to <br /> adjustment by the ENGINEER. <br /> rn <br /> i <br /> N <br /> M STREAM SUBSTRATE C; RADATIC:) N AND- <br /> 00 <br /> 1-1 <br /> M CALL COLORADO <br /> w <br /> 811 <br /> PLACEMENT N (DTES- <br /> 3: OR CALL UTILITY NOTIFICATION <br /> __'� i <br /> c� <br /> CENTER OF COLORADO <br /> 1 -800-922-1987 <br /> � CALL 3-BUSINESS DAYS IN ADVANCE <br /> li? BEFORE YOU DIG, GRADE, OR EXCAVATE <br /> _o FOR THE MARKING OF UNDERGROUND <br /> MEMBER UTILITIES <br /> 0 <br /> 0 <br /> N <br /> o COMMENTS DATE JOB NO. <br /> N NO. BY DATE DESCRIPTION DESIGN DTL 10/28/20 SOUTH PRONG STREAM RESTORA T/ON PLAN 831-032.921 <br /> WRIGHT WATER ENGINEERS, INC. ---- DETAIL DTL 10/28/20 REVISION NO. <br /> 2490 W. 26TH AVE. SUITE 100A __ - ---- ---- CHECK SIDS 10/28/20 <br /> DENVER CO 80211 __ APPROVAL ---- <br /> (303)480-1700 FAX(303)480-1020 -- ---- ---- ---- SCALE SHOWN TYPICAL SECTION <br /> SHEET NO. <br /> -- <br /> o ---- DT.dwg DT01 <br /> 0 <br />