Laserfiche WebLink
November 30, 2020 C-1980-007/West Elk Mine LDS <br />area for longwall panel SS2 prior to the vacatur of the North Fork Exception. MCC is permitted to <br />construct two additional drill pads in the Sunset Roadless area for longwall panel SS2. MCC is permitted <br />to drill mine ventilation boreholes on the drill pads constructed in the Sunset Roadless area for longwall <br />panel SS2. <br />MCC is not permitted to construct any additional roads in the Sunset Roadless area for longwall <br />panel SS2. <br />MCC is not permitted to conduct any ground disturbing activities in the Sunset Roadless area for <br />longwall panels 3 or 4, or any area not discussed above. <br />Abatement #: 2 <br />Abatement Due Date: 12/11/2020 <br />Abatement Due Extended Date: <br />Abatement Date: <br />Abatement Description: Notwithstanding BLM leases C-1362 and COC-67232, Mountain Coal <br />must provide the Division with detailed information regarding its assertion that it maintains legal right of <br />entry to the Sunset Roadless area and why it is not in direct conflict with the District Court order vacating <br />the North Fork Exception to the Colorado Roadless Rule. This abatement step is specific to longwall <br />panels SS3 and SS4 in the Sunset Roadless area. <br />On October 29, 2020, the 10t1i Circuit Court of Appeals issued an Order stating: "Pending our <br />consideration of the appeal, we enjoin Appellee Mountain Coal Company from imminently bulldozing <br />additional drilling pads on [the road constructed after issuance of this court's April 24, 2020, mandate in <br />No. 18-1374] and drilling methane ventilation boreholes in preparation for coal mining in the Sunset <br />Roadless Area." <br />Cessation Order CO-2020-001 remains in place, however the Appeals Court Order controls the Cessation <br />Order <br />Infraction Number: CV2020001 <br />Inspection Date: October 23, 2020 <br />Date Issued: <br />Primary Topic: Subsidence <br />Secondary Topic: Hydrologic Balance <br />Tertiary Topic: <br />Description: Failure to conduct subsidence survey; failure to protect hydrologic balance <br />Abatement #: 1 <br />Abatement Due Date: 12/1/2020 <br />Abatement Due Extended Date: 12/30/2020 <br />Abatement Date: <br />Abatement Description: Submit a technical revision to: (1) reconcile the mine plan with the <br />subsidence survey and include the information in an updated subsidence control plan as required by <br />2.05.6(6)(1); (2) update predictions of probable hydrologic consequences as necessary. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 4 of 15 <br />