My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-30_PERMIT FILE - M2020058 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020058
>
2020-11-30_PERMIT FILE - M2020058 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 3:19:21 PM
Creation date
12/3/2020 3:02:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020058
IBM Index Class Name
Permit File
Doc Date
11/30/2020
Doc Name Note
Map 1 of 5
Doc Name
Application
From
Aggregate Industries - WCR, Inc.
To
DRMS
Email Name
DC1
JLE
AWA
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
150 o 150 300 450 <br />(IN FEET) <br />1INCH =15oFEET <br />/ ! <br />LEGEND: <br />psRwn ecwwoARY <br />PARCEL uws <br />FENCE <br />oLunnY WALL <br />| / <br />�00 <br />sx|Snwo noAo <br />4�71 <br />smsnwo m|wnn oowrooR -------- - <br />smsnwo MAJOR oowTnun --------4D70-- <br />0 <br />| |i| / N <br />pRoPoaco w|wnR comToun 4871--- <br />| ' � <br />pnoPnsco MAJOR oowToun 70--- <br />1. THE PROPOSED FINAL LAND USE FOR BAURER PIT IS DEVELOPED WATER <br />RESOURCES. <br />�--~-�-�------�----------------7F�-/k---� 2�EMINE CE���BE����CREA�ABE��GRADE\��R <br />------�---------� \/ -/ ~`�� STORAGE RESERVOIR. <br />-~--r' <br />/�+_�=� \ / 3. THE RESERVOIR SHALL BE CONSTRUCTED TO MEET STATE ENGINEER'S <br />OFFICE OPERATIONAL PERFORMANCE STANDARDS. <br />4� IN PREPARATION FOR SLURRY WALL C0N5TRUCT|0N, A COMBINATION--- ROAD AND WORKING PAD WILL BE GRADED ALONG THE SLURRY WALL <br />ALIGNMENT, THE GRADING WALL PRODUCE A RELATIVELY FLAT, STABLE <br />- <br />SURFACE APPROXIMATELY 50 TO 100 FEET IN WIDTH. <br />GAS PIPELI E -Z <br />PL <br />EL <br />5. SLURRY WALL CONSTRUCTION INCLUDES x 3 TO 5 -FOOT WIDE TRENCH <br />KEYED A M|N|wuN OF 2 FEET INTO SHALE BEDROCK. <br />O. SLURRY WALL SHALL BE CONSTRUCTED WITH BENTONITE SLURRY, A <br />SLURRY WALL TRAINSMISSION LINE POLES 100'SETBACK BLEND OF SOIL EXCAVATED FROM THE TRENCH, DRY BENT0N|TE, AND <br />BORROW SOILS. <br />^ 7� ALL STRUCTURES ASSOCIATED WITH MINING WILL BE REMOVED FROM THE <br />' SITE DURING FINAL RECLAMATION ACTIVITIES. <br />O ALL AVAILABLE TOPSOIL AND OVERBURDEN MATERIAL WILL BE USED FOR <br />� <br />/ BACKRLL|NG AND RECLAMATIDN <br />> . <br />3 1V GRADE 0R FLATTER <br />rR1 <br />07GET8ACK �,8� RNAL 5LOPES Y0LL HAVE H� . <br />//» \ � � \ r' <br />/ | \ ` / 10. DISTURBED UPLAND AREAS NOT V0TM|N THE RESERVOIR SHALL BE <br />REVEGETATED WITH THE FOLLOWING NATIVE GRASS SEED MIXTURE. <br />- |/\ 100'8ETBACK | <br />�\\ EDGE OFLAKE) <br />| ' <br />PERMIT BOUNDARY ' <br />r | \ <br />/ | `'\// <br />/ <br />11. PERIODIC INSPECTION FOR NOXIOUS WEED5, AT LEAST 0NCE A YEAR <br />EARLY IN THE SEASDN, WILL BE DONE AS PART OF A WEED <br />MANAGEMENT PLAN. <br />12 BEST MANAGEMENT PRACTICES WILL BE USED TO CONTROL EROSION AND <br />SUSPENDED SEDIMENT RUNOFF FROM THE SITE DURING RECLAMATION <br />ACTIVITIES. <br />TYPICAL RECLAMATION SECTION AT PERMIT BOUNDARY <br />100' MIN. --I r- TOP SOIL <br />TOP SOIL <br />[� <br />Z) \ U���� / _",,,—HISTORIC GROUND <br />| <br />RECLAIMED SLOPE <br />5' _1 JO'OVERBURDEN 1 - 4 <br />M -I.- Kvil <br />SLURRY—/ '-—MINING FLOOR <br />WALL <br />\ \-BACKFILL <br />� <br />km <br />"uv 7 <br />8\O�0 <br />-"�v�w <br />MINING H|GHWALL <br />45 <br />o <br />loom -- <br />Lij <br />CL <br />i <br />Lu w <br />ry <br />75 <br />LL <br />z <br />00 <br />X <br />II - <br />75 <br />LLI <br />Date: <br />NOVEMBER 2020 <br />Job No: <br />237-013 <br />Drawn: <br />B. MATHISEN <br />Design: <br />B. MATHISEN <br />Checked: B. SCHENDERLEIN <br />
The URL can be used to link to this page
Your browser does not support the video tag.