Laserfiche WebLink
Percentages <br /> State 0 Federal 0 Local Agency 0 <br /> 17. What post mining land uses will be made of the extraction and why? (This <br /> question helps us determine the intent of the activity.) <br /> A post use of the land has not been determined or approved by Lake County. <br /> Industrial or other uses approved by the County will be implemented <br /> 18. What types and sizes of equipment will be used in the extraction? <br /> Front end loaners-approximately 3 cu yds and over the road 25-30 ton haul <br /> trucks Screens will be used to sort dump material with material greater that <br /> two inches will be rejected-screen foot print will be less than 20 x 20 feet <br /> Please send the completed questionnaire to the Division at the address above for review. <br /> The Board has directed the Division to make a decision based on the information you have <br /> supplied. We trust that the activities will be performed as represented. If we receive a <br /> complaint, we are required by law to conduct an inspection of the site. Which could result <br /> in a violation, a cease and desist order, and other corrective actions including submittal of <br /> a permit application. <br /> If you have any questions, please contact the Division at (303)866-3567. Please feel free <br /> to visit our web site at: https:Hcolorado.jzov/drms for further access to the full Act and <br /> Rules governing extraction of metals, non-metals, and construction materials in the State <br /> of Colorado. <br /> Sincerely, <br /> Division of Reclamation, Mining and Safety Staff <br /> Enclosure: Rule 1.2 excerpt for Hard Rock Metal Mines and Construction Materials <br /> Rule 1.2 excerpt for Hard Rock/Metal Mining <br /> Page 4 of 6 <br />