My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-02_PERMIT FILE - M2020061
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020061
>
2020-12-02_PERMIT FILE - M2020061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 5:42:53 AM
Creation date
12/2/2020 11:46:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020061
IBM Index Class Name
Permit File
Doc Date
12/2/2020
Doc Name
Is It Mining?
From
Union Milling Contractors
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/8/2020 Federal Register::National Oil and Hazardous Substance Pollution Contingency Plan:Partial Deletion of the California Gulch Superfund... <br /> D&RGW's 1996 Final Stockpiled Fine Slag Feasibility Study(1996 OU3 FS)focused on the AV Smelter Slag <br /> Pile's existing fine slag subpile and fine slag potentially generated from future ballast production.Based upon <br /> the 1993 SFS and 1993 D&RGW CD,the remedial action objective for the stockpiled fine slag was to:prevent <br /> leaching of metals of concern in concentrations that would have an adverse impact on soils,surface or <br /> ground water near the slag piles.The 1996 OU3 FS provided a detailed analysis of the three retained <br /> remediation alternatives(no action,institutional controls,and resource utilization)from the 1993 SFS as <br /> applied to the stockpiled fine slag.The result of the 1996 OU3 FS for the stockpiled fine slag was a Proposed <br /> Plan with a No Action Alternative for the stockpiled fine slag subpile of the AV Smelter Slag Pile.In <br /> September 1996,the Proposed Plan was issued with a preferred alternative of"No Action,"with a <br /> contingency for future utilization of the slag. <br /> OU3 Selected Remedy <br /> The EPA issued the Stockpiled Fine Slag—Arkansas Valley Smelter Slag Pile ROD for OU3 on May 6,1998 <br /> (1998 OU3 ROD).Based on consideration of CERCLA requirements,detailed analyses of alternatives,and <br /> public comments,the EPA determined that a No Action alternative was the appropriate remedy.The No <br /> Action alternative leaves the stockpiled fine slag in its existing condition with no control or cleanup planned. <br /> The No Action alternative includes a provision,denoted as a contingency,for future utilization of the slag,if <br /> it is encapsulated prior to its use or reuse.The 1998 OU3 ROD also provides a provision to use the slag in the <br /> future if regional market demand exists for the material as a component in construction materials. <br /> The 1998 OU3 ROD did not require maintenance of the fine slag piles.Any future use of the slag would <br /> require encapsulation prior to reuse.Encapsulation can include the use of fine slag in concrete or asphalt <br /> aggregate,as a road base,or as backfill(so long as the slag is chemically bound or physically separated from <br /> an exposure by a barrier consisting of a different material). <br /> Sampling in the Poverty Flats rail yard property and the Harrison Avenue property shows levels of lead in <br /> soils above levels that would allow for unlimited use and unrestricted exposure,i.e.,above the residential <br /> action level established for OU9,Residential Populated Areas of the Site.In addition,the Mineral Belt Trail, <br /> which was constructed on the former railroad easement,acts as a cap for fine slag and residual slag remains <br /> in other parts of OU3.Thus,the August 6,2014 ESD(2014 OU3 ESD)addresses the need for ICs,and <br /> documents the decision to require ICs for OU3.In addition,the use of the term"contingency"for fine slag <br /> utilization in the 1998 OU3 ROD is clarified in the 2014 OU3 ESD.Fine slag can be used for future <br /> commercial purposes by following the requirements set out in the 1998 OU3 ROD. <br /> OU3 Cleanup Standards <br /> As the final determination in the 1998 OU3 ROD was No Action ROD,no cleanup standards were identified <br /> for fine slag in the record of decision.The OU12 remedy addresses site-wide surface water and groundwater <br /> contamination. <br /> OU3 Response Actions <br /> No response actions were taken pursuant to the No Action ROD.The ICs established by the City and County <br /> ordinances were response actions that were incorporated into the OU3 remedy by the ESD.Lake County,on <br /> March 3,20o9,and the City of Leadville,on May 7,2013,implemented ICs in the form of local ordinances, <br /> amending the Land Development Codes and adopting regulations that protect both engineered and non- <br /> engineered remedies at OU3.A best management practice handout is provided to all applicants applying for <br /> https://www.federalregister.gov/documents/2016/02/09/2016-02601/national-oil-and-hazardous-substance-pollution-contingency-plan-partial-deletio... 13/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.