Laserfiche WebLink
November 30,2020 C-1981-022/Elk Creek Mine LDS <br /> c pya. <br /> �,� -��:.�r r�'. a � •�'sr- . ate'. .. .��•� <br /> Figure 8: Upper facilities pad, with head tank, substation, compressor building, <br /> methane drainage building, thermal oxidizer/generator facility and reclaimed site of <br /> topsoil stockpile. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 1 <br /> Page 10 of 15 <br />