My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-27_PERMIT FILE - C1981035 (22)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2020-10-27_PERMIT FILE - C1981035 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 5:08:53 AM
Creation date
12/1/2020 11:48:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Permit File
Doc Date
10/27/2020
Section_Exhibit Name
KII Appendix 16 Dunn Ranch LBA Technical Resources Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2 Air and Climate Resources <br /> 2.2.1 Affected Environment <br /> 2.2.1.1 Airshed for Analysis <br /> The affected environment for the air quality analysis includes La Plata and Montezuma counties,although <br /> most direct air quality impacts would be limited to the vicinity of the mine itself(BLM and OSMRE 2017, <br /> Map A-5). Indirect effects associated with coal transport and combustion occur at numerous locations. <br /> Most of the coal produced (approximately 83 percent) is transported by truck to a rail terminal in Gallup, <br /> New Mexico. Approximately 1,067,040 tons per year (tpy) can be delivered to markets in the <br /> southwestern U.S. via the Gallup rail hub. Of the total, approximately 181,000 tpy are delivered by truck <br /> to two GCC-owned and operated cement plants in Pueblo, Colorado (105,000 tpy) and in Tijeras, New <br /> Mexico (76,000 tpy) where the coal is used as a fuel source in the cement manufacturing process. Small <br /> coal volumes are also sold and delivered by truck to the Durango & Silverton Narrow Gauge Railroad <br /> (3,600 tpy),the Cumbres and Toltec Scenic Railroad in Chama, New Mexico (1,500 tpy), and locally(7,000 <br /> tpy)for home heating.The remaining approximately 880,940 tons would be delivered by rail from the rail <br /> terminal in Gallup, New Mexico to GCC-owned cement plants in northern Mexico (240,000 tpy) and to <br /> variable cement facilities in Arizona and Texas. It is unknown as to which cement plant(s) King II coal may <br /> potentially be sent within Arizona and Texas,or even to which more general geographic areas within those <br /> states.This is because of two reasons: 1.)the facilities in those states that are potential purchasers of King <br /> II coal are not necessarily owned by GCC; and, 2.) most importantly, no further information is available <br /> about future potential sales in these areas as the markets are highly variable and speculative from year to <br /> year. Although the Northern Mexico facilities are GCC-owned, Mexico is a different air quality regulatory <br /> jurisdiction than the U.S where U.S. standards and regulations do not apply. <br /> 2.2.1.2 Regulatory Requirements <br /> The regulatory framework for air quality includes both federal and state rules, regulations, and standards <br /> promulgated by the Environmental Protection Agency (EPA) and implemented by the Colorado <br /> Department of Public Health and Environment (CDPHE).The Clean Air Act (CAA) established the National <br /> Ambient Air Quality Standards(NAAQS)for seven criteria pollutants.The criteria pollutants include carbon <br /> monoxide (CO), lead, nitrogen dioxide (NO2), ozone (Oa), particulate matter 10 microns (PM1o) or less in <br /> diameter, particulate matter 2.5 microns (PM2.5) or less in diameter, and sulfur dioxide (SO2) (Table 2.2- <br /> 1). <br /> Pursuant to the CAA,the EPA has developed classifications for distinct geographical regions known as Air <br /> Quality Control Regions. In Colorado, the state has been divided into eight multi-county areas that are <br /> generally based on topography and have similar airshed characteristics.The Project Area airshed analysis <br /> area (Section 2.2.1) lies in the Southwestern Air Pollution Control Region as designated by the State of <br /> Colorado.The EPA designates whole or partial counties as Attainment, Non-Attainment, or Maintenance <br /> for each criteria air pollutant. Regions classified as in Attainment are areas in which the pollutant has not <br /> exceeded the NAAQS. A Non-Attainment classification represents an area in which the pollutant has <br /> exceeded the NAAQS. The Maintenance designation is used when monitored pollutants have been <br /> reduced from the Non-Attainment to the Attainment levels. La Plata and Montezuma counties have been <br /> Dunn Ranch Area LBA and Mining Plan Modification 4 <br /> Technical Resources Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.