Laserfiche WebLink
ENVIRONMENTAL ASSESSMENT <br /> Table 1-1. Completed EAs for the King II Mine <br /> Agency EA Number Proposed Action(s) Issuance Date of FONSI <br /> and Decision Record <br /> BLM DOI-BLM-00-S010- Coal Exploration License COC- September 13, 2016 <br /> 2014-0025-EA 76563 for 23 exploration holes <br /> (18 exploration holes within the <br /> LBA area) <br /> BLM and DOI-BLM-CO-S010- Coal Lease Modification, Mining BLM—December 15, 2017 <br /> OSMRE 2011-0074-EA Plan Modification and Permit OSMRE—January 4, 2018 <br /> Renewal for the King II Mine <br /> BLM DOI-BLM-CO-S010- Amendment to Coal Exploration May 15, 2018 <br /> 2014-0025-EA License COC-76563 for 11 <br /> additional exploration holes <br /> The TRFO prepared EA number DOI-BLM-CO-S010-2014-0025 (Table 1-1)to analyze the potential impacts <br /> of an exploration program for the LBA area. Because the area analyzed in the exploration license <br /> application EA covers most of the proposed LBA area; shares drainage areas, the same environmental <br /> resources, and physical environment with the proposed LBA area;and that EA described and analyzed the <br /> effects of approximately 5.3 acres of surface disturbance, similar in scale to what would occur within the <br /> proposed LBA area, the Exploration License EA is incorporated by reference in this EA (available at <br /> https://eplanning.blm.gov/epl-front-office/eplanning/nepa/nepa register.do). <br /> DOI-BLM-CO-S010-2011-0074-EA analyzed: 1) the potential effects of a proposed lease modification by <br /> GCCE to add approximately 950.6 acres to existing federal coal lease COC-62920; 2)the potential effects <br /> of a proposed revision to GCCE's existing, OSMRE-approved mine permit CO-0106A for proposed mining <br /> in the lease modification parcels;and 3)the effects of OSMRE approval of a five-year renewal of that mine <br /> permit.Three of the four parcels comprising the lease modification on the north,east, and south portions <br /> of the mine permit boundary share portions of their borders with the proposed LBA being analyzed in this <br /> EA (BLM and OSMRE 2017). Because the area analyzed in the lease modification EA is immediately <br /> adjacent to the proposed LBA area;shares drainage areas,the same environmental resources and physical <br /> environment with the proposed LBA; and that EA described and analyzed the effects of the same mining <br /> methods to be utilized in the proposed LBA, the lease modification EA (BLM and OSMRE 2017) is <br /> incorporated by reference in this EA (available at: https://eplanning.blm.gov/epl-front- <br /> office/eplannine/planAnd Pro iectSite.do?methodName=renderDefaultPlanOrProiectSite&pro iectld=7089 <br /> 5). <br /> This EA tiers to and also incorporates by reference the Final EIS for the Final San Juan National Forest and <br /> Proposed TRFO Land and Resource Management Plan (RMP) (September 2013) (BLM and USFS 2013)and <br /> the TRFO RMP and Record of Decision (BLM 2015).These documents analyzed the general effects of coal <br /> leasing for the public lands within the TRFO. <br /> The King II Mine currently consists of approximately 26 acres of surface facilities on state-leased lands and <br /> approximately 830 acres of underground disturbance. The operation is located in Section 36, Township <br /> 35 North, Range 12 West, New Mexico Principal Meridian (NMPM)on CR 120 approximately 7 miles west <br /> Dunn Ranch Area Coal Lease by Application COC-78825 and Mine Plan Modification EA 1-2 <br />