Laserfiche WebLink
The Division's current calculated reclamation liability is $1,379,988.51. SPL has posted a <br />Financial Warranty Corporate Surety issued by Lexon Insurance Company in the amount of <br />$1,379,988.51 effective March 14th, 2018. <br />MAP DESCRIPTION <br />Map 1 - Phase II Bond Release SL-8 Area Delineation Map. This map shows all requested <br />Phase II areas. <br />Map 2 — Yoast Mine Permanent Features Map. This map shows permanent features <br />documented in the mine permit. <br />Map 3 — Phase II Bond Release SL-8 General Location Map. This map shows the general <br />location of the Yoast Mine property boundaries relative to other land marks <br />BOND RELEASE DOCUMENTATION <br />This application represents a formal request for partial Phase 11 Bond Release on 193 acres, (BRB- <br />2a and BRB-3) of reclaimed lands at the Yoast Mine (see Map 1). These reclaimed lands comply <br />with applicable success and demonstration criteria set forth in Rule 4 — Performance Standards <br />and the approved Yoast permit. <br />SUMMARY OF RECLAMATION AND MANAGEMENT HISTORY <br />PHASE II RELEASE AREAS <br />Map 1 breaks the requested Phase II area down into parcels which are then identified by numbers <br />relating them to the provided table on the map detailing the parcel history. Backfilling and re- <br />grading of the Yoast Mine took place between 1997 and 2007, generally being completed within <br />180 days following the coal removal. The Phase II SL-8 requested areas were seeded between <br />2007 and 2013. All areas have been reclaimed in accordance to the permitted reclamation plan and <br />approved post -mining land use. Topsoil replacement details can be found within the SL-3 bond <br />release document. While the exact dates of topsoil replacement are not known, it can be logical to <br />assume that topsoil replacement occurred within the same year as revegetation. Revegetation dates <br />are shown on Exhibit B, Chronological Revegetation. <br />SL-8 - 4 <br />