My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-30_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2020-11-30_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 4:54:58 AM
Creation date
11/30/2020 11:49:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Revision
Doc Date
11/30/2020
Doc Name
Adequacy Review Response
From
Colorado Legacy Land
To
DRMS
Type & Sequence
AM5
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO LEGACY LAND <br /> M-1977-300 APPLICATION AMENDMENT#5,COMMENT AND RESP <br /> COMMENT NO. COMMENT <br /> Exhibit E-Reclamation Plan(Rule 6.4.5):An estimate of the The surface expression of the proposed areas is currently <br /> 4a periods of time which will be required for the various stages or unimpacted and are expected to remain unimpacted. No <br /> phases of reclamation. revisions have been made in response to this comment. <br /> Exhibit E-Reclamation Plan(Rule 6.4.5).A description of the size The surface expression of the proposed areas is currently <br /> 4b unimpacted and are expected to remain unimpacted. No <br /> and location of each area to be reclaimed during each phase. <br /> revisions have been made in response to this comment. <br /> Exhibit E-Reclamation Plan(Rule 6.4.5).An outline of the The surface expression of the proposed areas is currently <br /> 4c sequence in which each stage or phase of reclamation will be carried unimpacted and are expected to remain unimpacted. No <br /> out. revisions have been made in response to this comment. <br /> Exhibit E-Reclamation Plan(Rule 6.4.5):Exhibit E- Revised as requested. Section E.4 has been revised to include the <br /> Reclamation Plan(Rule 6.4.5-According to the operator's following text: <br /> estimates,approximately 39,000 cy of impacted soils will need to be <br /> excavated from the valley,and the Minnesota Mine"CV Glory Hole" '7n the event that the Minnesota and Black Forest reach capacity <br /> has a remaining capacity of approximately 28,000 cy.The proposed before the excavation is complete, CLL will meet with DRMS and <br /> Black Forest Mine disposal location has an estimated capacity of other regulatory agencies as appropriate to attain consensus on the <br /> 15,000 cy,which means there should be enough capacity in both of most appropriate option(capped waste rock pile,or offsite <br /> 5 these mines to accommodate the estimated volume of impacted soils repository)or combination of options,for disposal of alluvial fill <br /> remaining to be excavated.However,given the estimated volume has source term materials from the Schwartzwalder Mine site." <br /> changed during the excavation project,it would seem there is <br /> potential for the estimated volume to change again.Therefore,in the <br /> situation where the remaining volume of impacted soils in the valley <br /> exceeds the combined capacity of the CV Glory Hole and Black Forest <br /> Mine,please describe how the operator intends to dispose of any <br /> excess material. <br /> PAGE 5 OF 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.