Laserfiche WebLink
Ready Mix Concrete Substitute Water Supply Plan Page 9 of 9 <br /> November 24, 2020 <br /> substitute supply is of a quality to meet requirements of use to which the senior appropriation <br /> receiving the substitute supply has normally been put. As such, water quality data or analyses <br /> may be requested at any time to determine if the requirement of use of the senior appropriator <br /> is met. <br /> 20. The decision of the state engineer shall have no precedential or evidentiary force, shall not <br /> create any presumptions, shift the burden of proof, or serve as a defense in any water court <br /> case or any other legal action that may be initiated concerning the SWSP. This decision shall not <br /> bind the state engineer to act in a similar manner in any other applications involving other SWSPs <br /> or in any proposed renewal of this SWSP, and shall not imply concurrence with any findings of <br /> fact or conclusions of law contained herein, or with the engineering methodologies used by the <br /> Applicant. <br /> If you have any questions concerning this approval, please contact Wenli Dickinson in Denver at <br /> (303) 866-3581 or Dean Santistevan in Greeley at (970) 352-8712. <br /> Sincerely, <br /> �82 <br /> Jeff Deatherage, P.E., <br /> Chief of Water Supply <br /> Attachment: Figure 1 <br /> Tables 1, 2, and 3 <br /> City of Aurora Lease Extension <br /> Letter from DRMS dated April 30, 2010 <br /> Augmentation Plan Accounting Division 1 Administration Protocol <br /> cc: Dean Santistevan, Assistant Division Engineer, Dean.SantistevanCstate.co.us <br /> Jorge Vidal, Water Commissioner, Water District 2, Jorge.Vidat@state.co.us <br /> Brent Schantz, River Operations Et Compact Coordinator, Brent.SchantzCstate.co.us <br /> Division of Reclamation Mining and Safety, dnr_drmsminadminCstate.co.us <br /> JD/JMW/wad: Morton Lakes Mine Approval 2021.docx <br />