My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-24_HYDROLOGY - M2008082
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2020-11-24_HYDROLOGY - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 5:39:54 AM
Creation date
11/28/2020 11:25:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
11/24/2020
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division of Water Resources <br /> November 24, 2020 <br /> Jennifer S. Lindahl, P.E. <br /> Bishop-Brogden Associates, Inc. <br /> 333 West Hampden Avenue, Suite 1050 <br /> Englewood, Colorado 80110 <br /> Re: Morton Lakes Pit Substitute Water Supply Plan (WDID 0202616) <br /> Morton-Holton Lakes Mine DRMS File No. M-2008-082 (WDID 0203053) <br /> Sections 1 and 12, T1 N. R67W of the 611 P.M. <br /> Sections 6 and 7, T1 N. R66W of the 6t" P.M. <br /> Water Division 1, Water District 2, Weld County <br /> SWSP ID: 5178 <br /> Approval Period: October 1, 2020 through December 31, 2021 <br /> Contact phone number for Ms. Lindahl: (303) 806-8952 <br /> Contact email address for Ms. Lindahl: jlindahl@bbawater.com <br /> Dear Jennifer S. Lindahl, P.E.: <br /> We have reviewed your letter dated October 1, 2020 requesting renewal of the substitute water <br /> supply plan ("SWSP") to cover depletions at the Morton Lakes Mine ("Morton Lakes") and Holton <br /> Lake Mine ("Holton Lakes"), operated by Ready Mixed Concrete Company ("RMCC" or Applicant"). <br /> On March 6, 2017 the Colorado Division Mining and Safety ("DRMS") approved the incorporation of <br /> the Holton Lakes Mine into the Morton Lakes Mine, therefore both mining permits are now operating <br /> under Morton Lakes Mine (M-2008-082). <br /> The current SWSP for the Morton-Holton Lakes was approved on February 13, 2020 to cover <br /> operations for January 1, 2020 through December 31, 2020. This SWSP seeks to amend the previously <br /> approved SWSP for the period of October 1, 2020 through December 31, 2020 and will cover the <br /> estimated depletions from January 1, 2021 through December 31, 2021. This SWSP supersedes the <br /> SWSP approved on February 13, 2020 for the period of October 1, 2020 through December 31, 2020. <br /> The required fee of $257 for this SWSP has been submitted (receipt no. 10006688). <br /> SWSP Operations <br /> The Morton-Holton Lakes Mine is located in the SE 1/4 of Section 1 and the NE 1/4 of Section 12, all in <br /> Township 1 North, Range 67 West of the 6t" P.M., and the SW 1/4 of Section 6, and the NW '/4 of <br /> Section 7, all in Township 1 North, Range 66 West of the 6t" P.M. The depletions that result from <br /> the mining operation over the period of this SWSP include evaporation from exposed groundwater, <br /> dust suppression, dewatering, water used to wash mined product, water removed in mined product, <br /> refill of Stage 2, and water pumped for construction of reservoir storage. <br /> Mining of the Morton-Holton Lakes site is presently expected to last up to fifteen years. The current <br /> mining plan for the site is shown in attached Figure 1. The replacement of depletions for Morton- <br /> Holton site is fully consumable water leased from the City of Aurora. <br /> OF.COL <br /> �v <br /> 1313 Sherman Street, Room 821, Denver,CO 80203 P 303.866.3581 www.colorado.gov/water <br /> Jared S. Polis, Governor Dan Gibbs, Executive Director Kevin G. Rein, State Engineer/Director I F'= - O <br /> ti 1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.