Laserfiche WebLink
BULLDOZER WORK <br /> Task description: Backfdl and Regrade Portal/Office Area <br /> Site: Foidel Creek Mine Permit Action: MT8 Permit/Job#: C1982056 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 11/17/2020 County: Routt Filename: 001 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D10T- IOSU <br /> Horsepower: 574 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $170.04 NA <br /> Operating Cost/Hour: $153.03 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $364.36 <br /> Total Fleet Cost/Hour: $1,093.09 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 348,420 <br /> Swell factor: 1.125 <br /> Loose volume: 391,973 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 400 feet <br /> Unadjusted hourly 497.3 LCY/hr <br /> production: <br /> Materials consistency description: Dry,non-cohesive 0.8 <br /> Average push -15% <br /> gradient: <br /> Average site altitude: 7,000 feet <br /> Material weight: 2,650 lbs/LCY <br /> Weight description: Decomposed rock-25%Rock,75%Earth <br />