Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: MT6 RCE <br /> Site: Hayden Gulch Loadout Permit Action: MT6 Permit/Job#: C1992081 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 11/19/2020 County: Routt Filename: C081-000 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Regrade Rail Loop DOZER 2 79.85 $63,420 <br /> 002 Regrade Rail Spur DOZER 2 54.93 $42,279 <br /> 003 Regrade Facilities Area;Office/Parking Lot DOZER 1 5.94 $2,284 <br /> 006 Rip Facilities Area RIPPER 1 2.03 $809 <br /> 007 Rip Haul Road HGLF-HR1 RIPPER 1 2.65 $1,056 <br /> Oil Regrade Haul Road HGLF-HRI DOZER 1 6.34 $2,516 <br /> 015 Finish Grade Disturbed Area GRADER 1 56.63 $8,962 <br /> 018 Regrade Truck Loop Pond DOZER 1 1.68 $648 <br /> 019 Regrade Rail Loop Pond DOZER 1 5.70 $2,192 <br /> 020 Regrade All Ditches DOZER 2 8.41 $6,475 <br /> 021 Regrade Leach Field DOZER 1 6.73 $2,590 <br /> 024 Replace Topsoil on Rail Loop and Facilities Area SCRAPERI 1 122.73 $102,129 <br /> 025 Replace Topsoil on Rail Spur SCRAPERI 1 24.87 $20,694 <br /> 028 Seal Alluvial Wells HGDAL3 and 4 BOREHOLE 1 0.00 $255 <br /> 031 Drill Seed Mix#1 REVEGE 1 57.20 $38,257 <br /> 032 Drill Seed Mix#2 REVEGE 1 2.40 $1,148 <br /> 033 Drill Seed Mix#3 REVEGE 1 42.90 $29,918 <br /> 034 H droseed Mix#3 REVEGE 1 2.00 $3,319 <br /> 037 Demolish and Remove Structures DEMOLISH 1 0.00 $216,784 <br /> 040 Clean Sediment from Ponds Once During Liability TRUCKI 1 7.01 $3,596 <br /> Period <br /> 041 Site Maintenance over 10 year liability period SITEMAINT 1 80.00 $11,046 <br /> ENANCE <br /> 045 Mob/Demob equip.for Reclamation of Loadout MOBILIZE 1 3.60 $10,030 <br /> Area and TAHR <br /> 046 Mob/Demobilization for Pond Removal MOBILIZE 1 3.60 $3,561 <br /> 047 Mob/Demobilization for Maintanece and Pond MOBILIZE 1 3.60 $5,560 <br /> Cleaning <br /> 501 Rip TAHR RIPPER 2 55.40 $44,338 <br /> 502 Remove TAHR Surface Material to Pit SCRAPERI 2 104.56 $198,203 <br /> 503 Grade TAHR to Blend GRADER 1 66.61 $10,835 <br /> 504 Replace Topsoil from Stockpile A to TAHR SCRAPERI 2 33.69 $63,862 <br /> Stations 114 to 216 <br /> 505 Replace Topsoil from Stockpile C to TAHR SCRAPERI 2 27.76 $52,614 <br /> Stations 92 to 144 <br /> 506 Replace Topsoil from Stockpile D to TAHR SCRAPERI 2 9.64 $18,271 <br /> Stations 76 to 92 <br /> 507 Replace Topsoil from Stockpile E to TAHR SCRAPERI 2 15.58 $29,531 <br /> Stations 40 to 76 <br /> 508 Replace Topsoil from Stockpile F to TAHR SCRAPERI 2 7.02 $13,299 <br /> Stations 16 to 40 <br /> 509 Replace Topsoil from Stockpile G to TAHR SCRAPERI 2 4.55 $8,629 <br /> Stations 0 to 16 <br />