Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Replace Topsoil on Rail Loop and Facilities Area <br /> Site: Hayden Gulch Loadout Permit Action: MT6 Permit/Job#: C1992081 <br /> PROJECT IDENTIFICATION <br /> Task#: 024 State: Colorado Abbreviation: None <br /> Date: 11/19/2020 County: Routt Filename: 024 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA NA NA <br /> Ownership cost/hour: $181.30 NA NA NA NA NA <br /> Operating cost/hour: $203.87 NA NA NA NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA NA NA NA NA <br /> Ripper op.cost/hour: NA NA NA NA NA NA <br /> Operator cost/hour: $30.90 NA NA NA NA NA <br /> Unit Subtotals: $416.07 NA NA NA NA NA <br /> Number of Units: 2 0 0 0 0 0 <br /> Group Subtotals: Work: $832.14 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $832.14 <br /> MATERIAL QUANTITIES <br /> Initial volume: 80,180 CCY Swell factor: 1.125 <br /> Loose volume: 90,203 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,5501bs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Dry packed Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 32.00 LCY Adjusted Capacity: 29.00 LCY <br />