My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-12_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-11-12_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 1:10:43 PM
Creation date
11/24/2020 9:22:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
11/12/2020
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Type & Sequence
TR140
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
733
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
245 <br />246 <br />247 <br />248 <br />249 <br />250 <br />251 <br />252 <br />253 <br />254 <br />255 <br />256 <br />257 <br />258 <br />259 <br />260 <br />261 <br />262 <br />263 <br />264 <br />401 <br />402 <br />403 <br />404 <br />405 <br />406 <br />407 <br />408 <br />409 <br />410 <br />411 <br />412 <br />413 <br />414 <br />415 <br />416 <br />417 <br />418 <br />419 <br />420 <br />421 <br />422 <br />Construct Post-Mining Drainage Channels <br />NA <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />5,953.00 <br />$1,347,768.00 <br />$731.00 <br />$1,680.00 <br />$3,078.00 <br />$1,257.00 <br />$1,212.00 <br />$94.12 <br />$572.00 <br />$789.00 <br />$661.00 <br />$1,253.00 <br />$1,065.00 <br />$365.00 <br />$1,213.00 <br />$493.00 <br />$493.00 <br />$493.00 <br />$213,561.00 <br />$39.00 <br />$1,200.00 <br />$82,002.45 <br />$254,407.72 <br />$13,478.00 <br />$420,641.00 <br />$970,437.00 <br />$906,975.00 <br />$57,115.00 <br />$159,232.00 <br />$12,459.00 <br />$30,728.00 <br />$50,761.00 <br />$49,433.00 <br />$122,836.00 <br />$64,115.00 <br />$991,339.00 <br />$475,186.00 <br />$6,095.00 <br />$2,239.00 <br />$3,657.00 <br />$5,508.00 <br />$10,487.00 <br />$28,860.00 <br />Rip Cut Line from Brush Fire (MR165) <br />RIPPER <br />1.51 <br />Reseed Cut Line from Brush Fire R165 <br />REVEGE <br />2.00 <br />Haul Tops oil fromPile 17A to Admin Building <br />TR107 <br />TRUCKl <br />0.44 <br />Replace Topsoil at Admin Building (TR107) <br />DOZER <br />5.04 <br />Reseed Admin Building TR107 <br />REVEGE <br />0.80 <br />Backfill Four Drill Holes NearWilson Reservoir <br />(TRI 10) <br />BOREHOLE <br />4.00 <br />Remove and Regrade StockPondPD1 <br />EXCAVATE <br />4.18 <br />Remove and Regrade Stock PondPD2 <br />EXCAVATE <br />5.77 <br />Remove and Regrade Stock Pond EPI <br />EXCAVATE <br />4.83 <br />Remove and Regrade Stock PondEP2 <br />EXCAVATE <br />9.16 <br />Remove and Re rade StockPondNTEP1 <br />EXCAVATE <br />7.79 <br />Remove and Regrade Stock Pond ETI <br />EXCAVATE <br />2.66 <br />Remove and Regrade Stock PondET2 <br />EXCAVATE <br />8.87 <br />Remove and Regrade StockPondETD1 <br />EXCAVATE <br />3.60 <br />Remove and Regrade Stock PondETD2 <br />EXCAVATE <br />3.60 <br />Remove and Regrade StockPond WTD1 <br />EXCAVATE <br />3.60 <br />Regrade HaulRoad A Widenin <br />DOZER <br />440.36 <br />Regrade TopsoilforRaw WaterLine Expansion <br />(MR182) <br />DOZER <br />0.08 <br />Reseed Raw Water Line Expansion(MR182) <br />REVEGE <br />0.50 <br />Remove Collom Haul Road and Facility Culverts <br />DEMOLISH <br />24.00 <br />Demo Collom Facilities and HaulRoad Crossing <br />R185 <br />DEMOLISH <br />60.00 <br />Rip 29,458' ofCollom Haul Road <br />RIPPER <br />12.69 <br />Haul/Regrade Spoilto CollomHaul Road: 00+00 - <br />208+00 <br />SCRAPER1 <br />93.23 <br />Haul/Regrade Spoilto CollomHaulRoad:208+00 <br />-282+00 <br />SCRAPERI <br />215.09 <br />Haul/Regrade Spoilto CollomHaulRoad:282+00 <br />-395+00 <br />SCRAPERI <br />204.35 <br />Haul/Regrade Topsoil to CollomHaul Road: <br />112+26 -149+00 <br />SCRAPER1 <br />12.66 <br />Haul/Regrade Topsoil to CollomHaul Road: <br />149+00 -222+20 <br />SCRAPERI <br />35.29 <br />Haul/Regrade Topsoil to CollomHaul Road: <br />222+20 -242+00 <br />SCRAPERI <br />2.76 <br />Haul/Regrade Topsoil to CollomHaul Road: <br />242+00 -275+20 <br />SCRAPERI <br />6.81 <br />Haul/Regrade Topsoil to CollomHaul Road: <br />275+20-298+10 <br />SCRAPER1 <br />11.25 <br />Haul/Regrade Topsoil to CollomHaul Road: <br />298+10-336+00 <br />SCRAPERI <br />10.96 <br />Haul/Regrade Topsoil to CollomHaul Road: <br />336+00-396+89 <br />SCRAPERI <br />27.23 <br />Reseed CollomHaul Road <br />REVEGE <br />116.35 <br />Regrade ColloruFacility Area <br />DOZER <br />523.23 <br />Load/Haul/Regrade Topsoil to Collom Facility <br />from TS 25A <br />TRUCKl <br />118.19 <br />Section 25 Pond Removal <br />DOZER <br />13.49 <br />Middle Pond Removal <br />DOZER <br />4.95 <br />Section 36 Pond Removal <br />DOZER <br />8.09 <br />Section 26 Pond Removal <br />DOZER <br />12.19 <br />Sidehill Pond Removal <br />DOZER <br />23.21 <br />Coal Stockpile Pond Removal <br />DOZER <br />63.87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.