Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />I I Scraper I Push Dozer I Source I <br />I Job Efficiencv: 1 0.830 1 NA I (CAT HB) I <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />HaulRoute: <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Trawl Time <br />(min) <br />1 <br />471.00 <br />5.50 <br />2.00 <br />7.50 <br />1131 <br />0.44 <br />HaulTime: 0.44 minutes <br />Return Route: <br />Seg# <br />Haul Distance (R) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />001n) <br />Travel Time <br />(min) <br />1 <br />471.00 <br />-5.50 <br />2.00 <br />-3.50 <br />2972 <br />0.21 <br />Return Time: <br />0.21 <br />minutes <br />Total Scraper teamcycle time: <br />2.25 <br />minutes <br />Adjustedforjob conditions: <br />1,283.73 <br />LCY/Hour <br />Selected Numberof Scrapers: <br />2 <br />Scraper(s) <br />Adjustedsingle scraper team (unit) hourly production: <br />1,283.73 <br />LCY/Hour <br />Adjusted multiple scraperteam(fleet) hourly production: <br />5,134.93 <br />LCY/Hour <br />Unadjustedunit production/hour: 1,546.67 LCY/Hour <br />Optimal Numberof Scrapers perpush <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) Totaljob time: 12.27 Hours <br />Unit cost: $0.562 /LCY Totaljobcost: $35,436 <br />