My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-09_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-10-09_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 9:31:25 AM
Creation date
11/24/2020 8:17:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/9/2020
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Type & Sequence
TR140
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
731
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br />Task description: ScaperPoly ID S-38 (Map 35A) <br />Site: Colowyo Coal Mine Pemnit Action: RN7 Pemmit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 059 State: Colorado <br />Date: 1/16/2018 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />I.,C1111.7r1•/Opl1JIWLVJID►Y1■ <br />Equipment Des <br />-Scraper: I Cat 637G w/pi <br />-Dozer: I NA <br />3;i1 <br />Abbreviation: None <br />Filename: C019-059 <br />COSTShiftbasis: 1 per day <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: I Water Tanker. 5.000 Gal. <br />Cost Breakdown: ScranerWorkTeam <br />Sunnort Eauinment Maintenance Eauinment <br />Totalworkteam cost/hour: $2,888.25 <br />MATERIAL OUANTITIES <br />Initial volume: 232,000 CCY Swell factor: 1.000 <br />Loose volume: 232,000 LCY <br />Source of estimatedvolume: Table 7 Exh. 1313-T-20 <br />Source ofestimatedswellfactor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />MotorGrader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />NA <br />$72.40 <br />$24.01 <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />NA <br />$14.49 <br />$8.53 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripperown. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripperop. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />NA <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />NA <br />$115.79 <br />$32.54 <br />Numberof Units: <br />8 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,739.92 <br />Support: <br />$0.00 <br />Maint: <br />$148.33 <br />Totalworkteam cost/hour: $2,888.25 <br />MATERIAL OUANTITIES <br />Initial volume: 232,000 CCY Swell factor: 1.000 <br />Loose volume: 232,000 LCY <br />Source of estimatedvolume: Table 7 Exh. 1313-T-20 <br />Source ofestimatedswellfactor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume,) Basis: <br />Materialweight: <br />1 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />User Provided <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />81,600.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.