My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-07_PERMIT FILE - C1981019A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2020-10-07_PERMIT FILE - C1981019A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 2:58:59 PM
Creation date
11/23/2020 5:45:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/7/2020
Type & Sequence
TR141
Section_Exhibit Name
Rule 4 Performance Standards -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> .e.: 04Pit,"'r,z::;.-t„s.,t, '„aM"M.0A`9XYhAti Wt*ax:.v t.i,.>%np",a....,ax srr-°<a 41e0,,e.,” ne” .. <br /> Designed terrace ditches will be constructed at approximately 100 foot vertical increments. Terrace Ditches <br /> will be backsloped to direct runoff against the face to prevent flows from overflowing the edge of the ditch. <br /> These terrace ditches will direct surface runoff perpendicular to the face into a permanent drainage channel <br /> designed to pass safely the runoff from a 100 year, 24 hour precipitation event. Terrace ditches are shown on <br /> Map 12 and design information is provided in Exhibit 7, Item 20, Part G. <br /> Reclamation, specifically topsoil replacement, seeding etc. will be implemented consistent with the Section <br /> 2.05 of the permit. <br /> CONSTRUCTION PLAN <br /> All available topsoil will be removed and either stockpiled for later use or direct haul replaced to a reclaimed <br /> area. <br /> Due to the fact that the valley fill locations are in close proximity to the initial boxcut area means the entire <br /> footprint of these fills must be stripped of topsoil. As described in further detail in this submittal under <br /> Section 2.05.3(1); "The entire seam sequence from the top overburden through to the bottom G8 seam, which <br /> resides in the area of the initial boxcut, will be placed in the valley fill locations; this will allow Colowyo <br /> enough spoil room to reach the desired mining depth." <br /> It is anticipated the valley fill drains and associated lateral drains will be constructed as one project during the <br /> first two years of operation in the South Taylor operation for practical purposes and as a necessary step in <br /> preparation of the area for full scale mining. <br /> Channels constructed along the outside of the valley fills (perimeter relief drains) will be built immediately <br /> after the logical completion of each terrace ditch across the faces of the fills, which obviously cannot be <br /> completed until such a time as the fills themselves develop and are constructed to meet PMT compliance. <br /> This activity will be logically sequential in that they will be developed from the bottom up. <br /> Colowyo will follow the Shannon& Wilson recommendation for excavation as described in Exhibit 23B. <br /> A controlled underdrain in accordance with the Shannon & Wilson recommendations will be placed in the <br /> natural drainage bottom from the head to the top of the fill, The harder, available sandstones obtained from <br /> the mining operation will be selectively handled and placed in at least a 24 foot wide by 8 foot high <br /> configuration to serve as the underdrain before covered by spoil material. The natural spoil sorting which will <br /> occur by utilizing the thicker lifts recommended by Shannon & Wilson will be sufficient to protect the drain <br /> from clogging above the geotextile fabric. <br /> Lift thicknesses up to 100 feet thick is acceptable and will be utilized to construct the fill. This method of <br /> spoil placement also enhances the construction of a free draining layer of spoil material at the base of the fill. <br /> Experience at Colowyo provides evidence that the natural sorting process which occurs while dumping in <br /> higher lifts is sufficient to create this drain. Inspection and documentation of this natural sorting is <br /> recommended and will be conducted by Colowyo. See the Inspection Plan section for additional details. <br /> INSPECTION PLAN <br /> During construction of the East Taylor and West Taylor Fills, Colowyo will provide the following <br /> information in certified reports as required by Rule 4.09.1(11). <br /> South Taylor/Lower Wilson—Rule 4,Page 8 Revision Date: 12/20/19 <br /> Revision No.: TR-135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.