Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Remove TAHR Surface Material to Pit <br /> Site: Hayden Gulch Loadout Permit Action: MT6 Permit/Job#: C1992081 <br /> PROJECT IDENTIFICATION <br /> Task#: 502 State: Colorado Abbreviation: None <br /> Date: 11/19/2020 County: Routt Filename: 502 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTSNft basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA 25 25 <br /> Ownership cost/hour: $181.30 NA NA NA $65.89 $73.77 <br /> Operating cost/hour: $203.87 NA NA NA $14.74 $27.25 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA NA NA $0.00 $0.00 <br /> Ripper op.cost/hour: NA NA NA NA $0.00 $0.00 <br /> Operator cost/hour: $30.90 NA NA NA $28.56 $21.12 <br /> Unit Subtotals: $416.07 NA NA NA $109.19 $122.14 <br /> Number of Units: 4 0 0 0 1 1 <br /> Group Subtotals: Work: $1,664.28 Support: $0.00 Maint: $231.33 <br /> Total work team cost/hour: $1,895.61 <br /> MATERIAL QUANTITIES <br /> Initial volume: 112,900 CCY Swell factor: 1.000 <br /> Loose volume: 112,900 LCY <br /> Source of estimated volume: Seneca II-W Permit Page 25-1-22 <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,550 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Gravel-Dry Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 32.00 LCY Adjusted Capacity: 29.00 LCY <br />