My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-20_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2020-11-20_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 10:45:06 AM
Creation date
11/23/2020 7:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
11/20/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
MT6
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/Demobilization for Pond Removal <br /> Site: Hayden Gulch Loadout Permit Action: MT6 Permit/Job#: C1992081 <br /> PROJECT IDENTIFICATION <br /> Task#: 046 State: Colorado Abbreviation: None <br /> Date: 11/19/2020 County: Routt Filename: 046 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $17.20 $29.63 $38.69 <br /> Operating Cost/Hour: $26.56 $47.02 $55.69 <br /> Operator Cost/Hour: $23.63 $23.63 $23.63 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $67.39 $123.81 $141.54 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> Cat D 10T- 10SU 84.53 $170.04 $141.54 1 $311.58 $141.54 $500.00 <br /> Drill/Broadcast 25.00 $6.72 $67.39 1 $74.11 $67.39 $250.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $11.19 $67.39 1 $78.58 $67.39 $250.00 <br /> (Bowie LD-90) <br /> Subtotals: 1 $464.27 $276.32 $1,000.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Flatbed Truck,6A,45K GVW $50.03 1 $50.03 $50.03 <br /> Subtotals: $50.03 $50.03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.