My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-20_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2020-11-20_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 10:45:06 AM
Creation date
11/23/2020 7:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
11/20/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
MT6
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Payload Capacity: 10.10 LCY <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 8.00 LCY <br /> Heaped Volume: 10.00 LCY <br /> Average Volume: 9.00 LCY <br /> Adjusted Volume: 10.00 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 9.74 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: Large <br /> Rated Capacity: 3.330 LCY(heaped) <br /> Bucket Fill Factor: 0.975 Loose material-mixed moist aggregates(95-100%)0.975 <br /> Adjusted Capacity: 3.247 LCY <br /> Job Condition Corrections: Site Altitude(ft.): 6400 feet <br /> Truck Loader Source <br /> Altitude Adj: 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 3 passes <br /> Excavators and Front Shovels: <br /> Machine Cycle Time vs.Job Condition Raring: AVERAGE <br /> Selected Value within this Basic Rating: AVERAGE <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump,maneuver): NA minutes <br /> Cycle Time Factors Factor(min.) Source <br /> Material: NA NA (Cat HB) <br /> Stockpile: NA NA (Cat HB) <br /> Truck Ownership: NA NA (Cat HB) <br /> Operation: NA NA (Cat HB) <br /> Dump Target: NA NA (Cat HB) <br /> Net Cycle Time Adjustment: NA minutes <br /> Adjusted Loader Cycle Time: 0.321 minutes <br /> Net Load Time per Truck: 0.742 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minute; <br /> Truck Load Time: 0.742 Minutes Adjusted for site altitude: 0.742 Minute; <br /> Truck Maneuver and Dump Time: 0.80 Minutes Adjusted for site altitude: 0.800 Minute; <br /> Truck Travel(Haul&Return)Time: Road Condition:Firm,smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.