Laserfiche WebLink
N) Primary commodity is gravel for roads, no secondary <br /> commodity <br /> O) Products used for road base, gravel, and fill material <br /> P) No explosives to be used <br /> EXHIBIT D <br /> A) Plan to mine hill completely to a flat spot with positive water <br /> drainage into a settlement pond. No overburden will be <br /> needed to fill anything, hill will be replaced with a cattle <br /> feedlot/corrals <br /> B) Maximum gradation will be a 2% slope into a settlement pond <br /> for a cattle feedlot/corrals <br /> Q With site to be a cattle feedlot/corrals. No vegetation will be <br /> needed. <br /> D) A settlement pond for the feedlot will remain to settle water <br /> runoff from corrals. <br /> E) No waste will be left all material will be utilized. <br /> 2. <br /> A, B, Q No for seeable reclamation cost based on a cattle <br /> feedlot/corrals won't need topsoil, or anything put back, gravel is <br /> best case <br /> EXIBIT E <br /> 1) No easements <br /> 2) A) Permit boundaries on map <br /> B) Owner of land Ernest Snare Living Trust, no other owners <br /> applicable <br /> Q Only major surface features, existing roads, scale house/office <br />