Laserfiche WebLink
BATTLE MOUNTAIN RESOURCES, INC. <br /> November13,2020 77) <br /> 7 <br /> Mr. Lucas West NOY <br /> DIVISICi-!Gi e l'I;ATION <br /> Colorado Division of Reclamation, Mining and Safety IV NINGANU S;WjETY <br /> 1313 Sherman Street, Room 21S <br /> Denver,CO 80203 <br /> Re:San Luis Project Tailing Dam Q3 2020 Annual Inspection Report,Technical Revision No.33, Permit No. M-1988- <br /> 112 <br /> Dear Mr.West: <br /> Battle Mountain Resources Inc.(BMRI)is pleased to provide the Q3 2020 Annual San Luis Tailing Dam Inspection <br /> Report in accordance with Technical Revision No.33 to BMRI's Reclamation Permit. <br /> The Inspection was conducted by Ms. Deb Miller and BMRI Site Manager David Carino. <br /> Enclosed with the inspection report are photos of the Tailing Impoundment facilities to include the drop structure <br /> and the under-drain discharge area.Also included are the Q3 2020 Piezometer Inspection results. <br /> espectfully, <br /> n <br /> J lio F. Madrid <br /> Sr Supervisor Colorado Legacy Sites <br /> (719)379-OS38 <br /> cc:Devon Horntvedt <br /> David Carino <br /> P.O.Box 310 • San Luis,Colorado 81152-0310 (719)379-0798 Fax(719)379-0713 <br />