Laserfiche WebLink
RECEIVED <br /> 1 °20 NEW ELK COAL <br /> OIV181®N� pE 10N' COMPANY <br /> MININ <br /> h <br /> RECEIVED <br /> November 5, 2020 <br /> Tabetha Lynch 0f R + <br /> Division of Reclamation, Mining and Safety V'1N1N5,ANQWE1Y <br /> 1313 Sherman St., Rm. 215 <br /> Denver, Colorado 80203 <br /> Re: New Elk NOI (X-2020-232-02) Adequacy Response <br /> Dear Tabetha Lynch: <br /> This letter is in response to the NOI X-2020-232-02 Adequacy Review Letter sent on <br /> October 23, 2020. <br /> 1. A new NOI application is attached with revised dates for the project. There are no <br /> other changes to the application. <br /> 2. The NOI has been filed at the Las Animas Courthouse per Rule 2.08.8(1). <br /> NECC agrees with the Amount of the Performance Bond. <br /> Sincerely, <br /> Nicholas Mason <br /> Engineering Technician <br /> Enclosed: NOI Application <br /> 1 I-15V *ate Hwy 12 F-'.,ONE (719)631-6146 <br /> Westc-A, C91orado 81091 <br /> 1 <br />