My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-17_PERMIT FILE - M1977342
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1977342
>
2020-11-17_PERMIT FILE - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 5:33:43 AM
Creation date
11/17/2020 9:20:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Permit File
Doc Date
11/17/2020
Doc Name
Adequacy Review Response
From
Climax Molybdenum
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10"BLIND <br /> FLANGE(4) <br /> APPROX. <br /> 6"DIAx8' 5.0' <br /> MATCH TO OAL APPROX. <br /> EXISTING BOLLARDS(6) 3.0' <br /> GROUND <br /> SURFACE <br /> QUIKRETE MIX — — — <br /> _ CONCRETE — — <br /> ENCASEMENT(8) — I� <br /> 10"SDR 17 SPOOL WITH — — — — — — — —I I I- <br /> 10"SDR 17 FLANGE- 11- <br /> FIELD CUT TO HEIGHT(3) — — <br /> _ — —COARSE PIPE — — — <br /> EXCAVATION SPOILS: BEDDING <br /> COMPACT IN MAXIMUM MINIMUM I-FT — — <br /> 2-FT LIFTS — _ — _ CLEARANCE <br /> —FROM 1 <br /> � <br /> COUPLINGS(5)— 1s <br /> I I _ <br /> NOTES: (UNLESS OTHERWISE SPECIFIED) TYP CLEANOUT ADDITION <br /> 1. CLEAN-OUT PORTS SHALL BE INSTALLED ON SCALE:3"=1'-0" <br /> BOTH PRIMARY AND BACKUP SEEPWATER 10"ELEC IN FUSION <br /> COUPLINGS-STOP 10"IPS MOLDED COLLECTION PIPELINES REMOVED IN FIELD(1) TEE SDR 17(2) <br /> 2. BLUE STAKE PERMITTING FROM MILL <br /> ENGINEERING DEPARTMENT IS REQUIRED <br /> PRIOR TO EXCAVATION. <br /> 3. ALL COARSE PIPE BEDDING AGGREGATE <br /> MUST BE PLACED IN IS"LIFTS AND TAMPED <br /> AROUND THE PIPE. <br /> 4 ENGINEEAPPROVE INSTALLATION PRIOR OG MUST BE BACCKFILL MATERIALS <br /> 5. EXCAVATION SPOILS MUST BE COMPACTED ID ITEM PART# QUANTITY <br /> IN MAXIMUM 2-FT LIFTS TO GRADE. 10"ELECTRO FUSION COUPLINGS— <br /> COMPACTION METHOD TO BE DETERMINED IN NO STOP(FIELD REMOVE) <br /> lOEFCPL 18 <br /> FIELD AND SPECIFIED BY ENGINEERING Po O UC <br /> �Q� ....••F�/s (2) 10"IPS MOLDED TEES—DR17 lOHDPE17TM 6 <br /> 6. UNPROTECTED TRENCH SLOPES MUST BE V�; R g�••�FQ 10"X APPROXIMATELY 20 FT HDPE <br /> MADE AT 1.5:1 MINIMUM AND FOLLOW ALL O ) PIPE SPOOLS WITH 10"DR 17 FLANGE l OX240HDPEDRI7FLGXPESPOOL 6 <br /> FMI OPEN TRENCH POLICIES f'Q'(i' ""O�; (3) ADPT AND 10"DI BACK UP RING ON <br /> :` 51252 ONE END—DR17 <br /> 7. EACH CLEAN-OUT ADDITION MUST BE . . (4) 10"150#Blind Flange IOWFLG150RFBLNDI 6 <br /> PRESSURE LEAK TESTED FOR 24 HOURS TO p:. (5) NO 8 COARSE AGGREGATE TONN 36 <br /> MAXIMUM HEAD AND APPROVED BY <br /> ENGINEERING PRIOR TO BACKFILL .'�� (6) 6"x 8'OAL BOLLARDS 6X960BOL 6 <br /> S' •••M_ G RUST-OLEUM 7400 YELLOW METAL <br /> 8. ALL STEEL SHALL RELIEVE ONE SHOP COAT S/ONA�EN (7) PRIMER I <br /> OF RUST-OLEUM 7400 YELLOW METAL <br /> PRIMER,EXCEPT AREAS TO BE FIELD WELDED (8) 50 LB BAG QUICKRETE MIX 24 <br /> DWG.# REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY APPR DEPARTMENT APPROVALS ENGR: RH 01/28/2019 HENDERSON OPERATIONS TAILINGS AND WATER <br /> 020577 AS-BUILT OF:MILL WATER RETURN LINE DRAWN BY: RH 01/28/2019 <br /> 1333.1B-1 No.3 Dam Seepwaer Pipeline AS BUILTS 5/02/2020 RH DB CHECKED BY: EN 05/01/2019 C/imaxMol bdenu 3 DAM SEEPWATER <br /> 5-6-9030 3 DAM SEEPWATER CLEAN-OUT ADDITIONS IFC /03/201 RH DB APPROVED BY: DB 05/01/2019 Cl i ort-Mc V o Company CLEAN-OUT ADDITIONS <br /> APPROVED BY: EMPIREort-M Freeport-McMoRan <br /> CoADO DETAILS <br /> SCALE: AS SHOWN SAFETY APP BY: 303-569-3221 5-6-9030 SHT 5 0F 5 REV. <br />
The URL can be used to link to this page
Your browser does not support the video tag.