Laserfiche WebLink
3 DAM SEEPWATER CLEAN-OUT ADDITIONS AS-BUILT <br /> 0 I v <br /> ) COUNTY ROAD 3(CR(3) <br /> 3 DAM SEEPWATER V <br /> OUTFAL VAULT CLEAN-OUT PORT E <br /> CLEAN-OUT PORT <br /> �., 48"CMP LOWER FLOOD CLEAN-OUT PORT B <br /> BYPASS PIPELINE lK ') `1� <br /> CLEAN-OUT PORT D (ABANDONED) POWER LINE 3 DAM SEEPWATER <br /> �- PIPELINE(2 ea 10"HDPE) CR 3 GATE <br /> - CLEAN-OUT PORT CC <br /> CLEAN-OUT PORT C CLEAN-OUT PORT AA ~ <br /> 1 DAM CLEAN-OUT PORT A <br /> 36"!MIL'_ <br /> RETURN PIPELINE <br /> SEEPWATER (ABANDONED) — <br /> RETURN —_ �sa __ <br /> PIPELINES ��-"�� <br /> ion <br /> Is <br /> D 3 D— -- --- <br /> 3 DAM SEEPWATER— <br /> COLLECTION VAULT --=--- <br /> VICINITY MAP <br /> 400 0 400 800 <br /> SCALE I —400' FEET <br /> 2019 CLEAN-OUT LOCATIONS DRAWING LIST <br /> PORT NORTHING EASTING SHEET o�P90 F NUMBER DRAWING TITLE <br /> AA 193371.154 1836860,980 � •� RO•BF?s`c0 01 COVER SHEET <br /> BB 194404.104 1836244.811 •� 70 � 02 SECTION 1:STA 0+00-20+00 <br /> 6' O � 03 SECTION 2:STA 20+00-40+00 <br /> CC 195478.903 1834988.202 .'D 512.52 r 04 SECTION 3:STA 40+00-57+80 <br /> • 05 DETAILS <br /> • w <br /> �ss'ONAL� PIPELINE CLEAN-OUT PORT <br /> DWG.# REFERENCE DRAWINGS DESCRIPTION OF REVISION DATE BY APPR DEPARTMENT APPROVALS ENGR: RH 01/28/2019 HENDERSON OPERATIONS TAILINGS AND WATER <br /> 020577 AS-BUILT OF:MILL WATER RETURN LINE DRAWN BY: RH 01/28/2019 <br /> 1333.113-1 No.3 Dam Seepwaer Pipeline t AS BUILTS 5/02/2020 RH DB CHECKED BY: EN 05/01/2019 I a ClimaxMolybdenu 3 DAM SEEPWATER <br /> 5-6-9030 3 DAM SEEPWATER CLEAN-OUT ADDITIONS IFC /03/201 RH DB APPROVED BY: DB 05/01/2019 • CLEAN-OUT ADDITIONS <br /> APPROVED BY: A Freeport-McMoRan an COVER SHEET <br /> EMPIRE PARSHALL.COLORADO ADO <br /> SCALE: AS SHOWN SAFETY APP BY: 303-569-3221 5-6-9030 SHT 1 OF 5 1 REV. i <br />