My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-16_REVISION - M2016085
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016085
>
2020-11-16_REVISION - M2016085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 5:30:32 AM
Creation date
11/17/2020 7:45:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016085
IBM Index Class Name
Revision
Doc Date
11/16/2020
Doc Name
Request for Surety Reduction
From
J&T Consulting
To
DRMS
Type & Sequence
SR1
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. Northern Colorado Constructors <br /> Bennett Pit <br /> 11 rono2o <br /> ;Recla' <br /> n Bond Quantities and Costs <br /> 0 IJ!T CoiaullhvL I1t& 16116 Bennett Pit Rec Bond Calcs <br /> Phase 1 -57.2.2 more&(North Cell,Access Road,Plant Site Areas,Topsoil/OB Stockpile in South Cell) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall Reduced by 50%Because SEO Provisional Approval of Leak Test 5,705 If $ 126.00 $ 359,415 <br /> Scarifying-Topsoil/OB Stockpile,Access Road,Plant Site Areas 18.40 ac $ 200 $ 3,680 <br /> Topsoil Placement-Topsoil/OB Stockpile,Access Road,Plant Site Areas 18.40 ac $ 1,800 $ 33,120 <br /> Revegetate-Topsoil/OB Stockpile,Access Road,Plant Site Areas 18.40 ac $ 1,000 $ 18,400 <br /> Scarifying-Disturbed Areas-North Cell to Water Surface 7.90 ac $ 200 $ 1,580 <br /> Topsoil Placement-Disturbed Areas-North Cell to Water Surface 7.90 ac $ 1,800 $ 14,220 <br /> Revegetate-Disturbed Areas-North Cell to Water Surface 7.90 ac $ 1,000 $ 7,900 <br /> Mobilization 7.9 Is $ 2,500 $ 19,750 <br /> Total Direct Cost $ 458,065 <br /> Overhead and Profit Cost(12.60%) $ 57,716 <br /> Contract Cost 515,781 <br /> Project Management(9.25%) $ 47,710 <br /> Total Required Financial Warranty For Phase 1 $ 563,491 <br /> Phase 2 -67.87 more*(South Cell) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall Required to Close Phase 2 6,185 if $ 126.00 $ 779,310 <br /> Scarifying-Disturbed Areas-South Cell to Water Surface 850 ac $ 200 $ 1,700 <br /> Topsoil Placement-Disturbed Areas-South Cell to Water Surface 8.50 ac $ 1,800 $ 15,300 <br /> Revegetate-Disturbed Areas-South Cell to Water Surface 8.50 ac $ 1,000 $ 8,500 <br /> Mobilization 1.0 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 807,310 <br /> Overhead and Profit Cost(12.60%) $ 101,721 <br /> Contract Cost $ 909,031 <br /> Protect Management(9.25%) $ 84,085 <br /> Additional Financial warranty Required For Phase 2 $ 993,116 <br /> Cummulative Financial Warranty Required For Phase 1-2 $ 1,556,607 <br /> 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.