My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-12_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2020-11-12_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 1:51:37 PM
Creation date
11/12/2020 12:46:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
11/12/2020
Doc Name Note
Review 2018 and 2019
Doc Name
Annual Hydrology Report
From
DRMS
To
Tri-State Generation and Transmission Association
Annual Report Year
2018
Permit Index Doc Type
Hydrology Report
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DNR <br />COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />November 12, 2020 <br />Tony Tennyson <br />Tri-State Generation and Transmission Association <br />1100 West 116 b Avenue <br />Westminster, CO 80234 <br />Re: Colowyo Coal Company, Permit No. C-1981-019 <br />Review of 2018 and 2019 Annual Hydrology Reports (AHRs) <br />Dear Mr. Tennyson: <br />The Colorado Division of Reclamation, Mining and Safety (the Division) has reviewed the 2018 <br />and 2019 AHRs for the Colowyo Mine in the context of Rules 4.05.1, 4.05.6, 4.05.11, and <br />4.05.13 (Regulations of the Colorado Mined Land Reclamation Board for Coal Mining) and <br />considering the ongoing conversations about the 2017 AHR between the Division and Tri-State <br />Generation and Transmission Association (Tri-State). <br />Table 1 lists several important logistical requirements of the Colowyo Mine water monitoring <br />plan, and indicates if the requirement was met in the 2018 and 2019 AHRs. <br />Table 1 Requirements of the Colowyo Mine Water Monitoring Plan <br />Requirement <br />Regulation or other source <br />Requirement <br />of requirement <br />met for 2018 <br />and 2019? <br />Filing frequency of AHR - annually <br />Rule 4.05.13 (4) (c) <br />yes <br />Timely filing of hydrology report - submitted <br />Section 2.04.13 of the <br />yes <br />by March 15 each year. <br />Colowyo Mine PAP. <br />Sites sampled and sampling frequency at <br />Section 4.05.13 of PAP <br />Unclear <br />surface water monitoring sites <br />Collom Rule 4 <br />Parameters sampled at surface water <br />Section 4.05.13 of PAP <br />yes <br />monitoring sites <br />Collom Rule 4 <br />Sites sampled and sampling frequency at <br />Section 4.05.13 of PAP <br />yes <br />groundwater monitoring sites <br />Collom Rule 4 <br />Parameters sampled at groundwater <br />Section 4.05.13 of PAP <br />yes <br />monitoring sites <br />Collom Rule 4 <br />OF COlO <br />�4�= <br />n O <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us * * <br />Jared S. Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director * * 1876 * <br />
The URL can be used to link to this page
Your browser does not support the video tag.