Laserfiche WebLink
Exhibit B <br /> (Continued — Page 3) <br /> C-CM-25: This mining operation has been fully reclaimed by Lessee and no reclamation <br /> liability currently exists for this lease tract. However, if at some future date, the reclamation <br /> completed by Lessee fails (subsidence at a shaft or portal site). Lessee would be expected to <br /> repair the feature as long as Lessee holds the existing lease. Costs associated with these repair <br /> activities should be minimal. <br /> Please note: These liabilities are inherent to the respective lease agreements and are <br /> transferred with any assignment of the lease agreements. <br /> Page 7 <br />