My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-02_REVISION - M1979094HR (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979094
>
2020-11-02_REVISION - M1979094HR (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:14:39 PM
Creation date
11/4/2020 8:50:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979094HR
IBM Index Class Name
Revision
Doc Date
11/2/2020
Doc Name
Request For Succession Of Operator
From
Highbury Resources Inc.
To
DRMS
Type & Sequence
SO1
Email Name
DMC
THM
AWA
JXT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 2020 DE—RO01-19LM70255 <br /> (1) A site-specific environmental analysis <br /> (2) A description of specific measures to be taken to ensure compliance with the requirements of <br /> Article XI,"COMPLIANCE WITH STATUTUES AND REGULATIONS,"including methods of <br /> reclamation contemplated by the Lessee <br /> (3) The specific information outlined in Appendix C of this Lease <br /> (b) All Exploration Plans submitted to DOE pursuant to this Article XII and all proposed activities <br /> contained therein shall be reviewed by DOE in accordance with 10 C.F.R.Part 1021,"National Environmental <br /> Policy Act Implementing Procedures." <br /> (c) If preparation and filing of an Exploration Plan for the entire operation is dependent upon factors <br /> which cannot or will not be determined except during the progress of any exploration activities,partial plans may <br /> be submitted and approved from time to time;however,the Lessee shall not perform exploration activities not <br /> described in an approved plan. <br /> (d) Changes may be made in the approved Exploration Plan by mutual written agreement of the <br /> Lessee and DOE.Approval is contingent upon the Lessee notifying all other appropriate agencies(as outlined in <br /> Appendix C)of the proposed changes. <br /> (e) All costs associated with the Exploration Plan,including any approvals or permits,shall be borne <br /> solely by the Lessee. <br /> XIII. MINING PLAN. <br /> (a) Prior to constructing any surface installation or commencing mine development on the Property, <br /> the Lessee shall file with DOE three(3)copies of a plan for the proposed mining operations and shall obtain <br /> DOE's approval of such plan(the"Mining Plan").Such mining plan shall be consistent with the"Reclamation <br /> Permit Application"(hereinafter"Application")to be filed with the Colorado MLRB in accordance with Rule 1.4 <br /> and Rule 6 of the"Mineral Rules and Regulations"of the Colorado MLRB,as these rules may be amended,and <br /> any other applicable laws or regulations.The Mining Plan shall include all information required by the Application <br /> and,in addition,must specifically include the following information: <br /> (1) A site-specific environmental analysis(in support of an environmental assessment,at a <br /> minimum) <br /> —6— <br />
The URL can be used to link to this page
Your browser does not support the video tag.