My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-03_REVISION - C1981044 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2020-11-03_REVISION - C1981044 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 8:15:43 AM
Creation date
11/3/2020 3:30:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
11/3/2020
From
DRMS
To
Peabody Energy
Type & Sequence
TR38
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I separated the tasks into separate headings in CIRCES: <br />0 000 Revegetation Updated TR38 <br />0 000 Haul Road TR38 <br />0 000 Strip Pit TR38 for the ponds <br />0 000 Revegetation RN7 <br />I calculated the direct costs for each heading. <br />1. Update the revegetation tasks (062, 063, 064, and 065) based on the revised <br />Updated Tasks in direct costs come to: $831 $866,881 <br />For the revegetation tasks I combined the categories Cropland or Pasture (64 acres), and Pasture (34 <br />For the revegetation tasks associated with RN7 the direct costs came to: $659,409 <br />2. Find the net change in liability with the revegetation costs. <br />000 Revegetation Udated TR38 minus 000 Revegetation RN7 <br />The net change in revegetation tasks represents an increase of $207,472 <br />4. Identify which tasks can either be removed or modified to account for the reten <br />5. Find the liability reduction appropriate for the haul road retention. <br />It appears that Access Road terminology was utilized to designate the Haul Road, so I used thou <br />I used the two above mentioned tasks and came up with direct costs of $1,110 that would be a i <br />6. Identify how much liability we hold for the sediment ponds for the Williams ForF <br />DRMS holds $3,324 in direct costs for the three ponds in the Strip Pit that have permanent dem <br />8. Calculate the net change in total liability associated with TR38. <br />Net change in liability = (Cost increase associated with revegetation tasks) - (Haul Road <br />$203,038 plus direct costs <br />for a total bond amount of $253,938 <br />
The URL can be used to link to this page
Your browser does not support the video tag.