Laserfiche WebLink
Exhibit D <br /> 2.Will all installed fencing be removed upon completion of mining? If so describe <br /> reclamation measures regarding fencing. <br /> All fencing will be removed during initial reclamation of each project area. Since there are <br /> phases to our operation and the long-term goal is to finish the upper area first and be on the <br /> lower slope area only during the final years of our permit. <br /> When Ridgetop Project Area starts reclamation,the "New Upper Fence" will be dismantled and <br /> removed from the site. "New Public Fence 1"will be reduced in length to only meet with "New <br /> Public Fence 2". Lower Fence will also be reduced in length. This is shown here: <br /> FencesUroject Areas <br /> hacks: <br /> Lower Fence <br /> New UpperFence <br /> New Pubh cF en cet <br /> New P ubli cF en ce2 <br /> Probcson Safety Fencet O <br /> Probctlon Safety Fence2 <br /> PoOpe ADO <br /> Siberia oJectAnea <br /> Mltlwry AOD 3Stoekpll• <br /> nne clot Protect Ai ea <br /> Purple Pipe ProjectArea 264f eel <br /> Unnarned Project Area <br /> created by GPSVeuaezer com <br /> Late Stage Permit Fencing(After Ridgetop, Midway, Connector, and Purple Pipe are in <br /> reclamation stage). <br /> Fences&Project Areas <br /> 80". <br /> aWerle ha}dArea <br /> Nah'{'ii bli cf en cc 1 <br /> Lower Fence <br /> Unnamed Project Area 52.5 feel <br /> New PubllcFence2 <br /> aea b/GPSVeaatmrwm <br />