My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-27_GENERAL DOCUMENTS - C1981035
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981035
>
2020-10-27_GENERAL DOCUMENTS - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:41:04 PM
Creation date
10/29/2020 1:05:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
General Documents
Doc Date
10/27/2020
Doc Name Note
For PR10
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
GCC Energy, LLC
Permit Index Doc Type
Findings
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Hydrologic Balance - Rule 4.05 <br />A. Water Quality Standards and Effluent Limitations <br />There is no surface disturbance proposed for this permit revision. As such, no sediment <br />control structures are required, for the PR10 parcels <br />B. Diversions and Conveyance of Overland Flow <br />No diversions are proposed for this permit revision. <br />C. Stream Channel Diversions <br />There are no stream channel diversions proposed or anticipated. <br />D. Sedimentation Ponds <br />No sediment ponds are proposed. <br />E. Acid-forming and Toxic -forming Spoil <br />There is no surface disturbance proposed with this permit revision, so no spoil will be <br />generated. <br />F. Impoundments <br />No impoundments are proposed. <br />G. Surface and Ground Water Monitoring <br />Section 2.05.6 of the PAP lists the many parameters to be monitored in groundwater <br />and surface water, and Map King II-012 shows the locations of monitoring sites <br />GCC Energy, LLC will conduct monitoring of ground water in a manner approved <br />by the Division. The ground water monitoring plan is as follows under the current <br />plan (since TR-26), ground water is monitored in four wells in the Hay Gulch <br />alluvium: MW-HGA-4, which is upgradient of King I; the Wiltse Well (near the <br />King I entrance); a well upgradient of King II and downgradient of King I; and a <br />well downgradient of King IL With TR-26 (issued November 2, 2016), four <br />bedrock monitoring "clusters" were added to the monitoring plan. Each cluster <br />contains three wells: a well in the Cliff House formation, a well in the "A" coal <br />seam, and a well in the interburden below the "A" seam. (4.05.13(1)) <br />2. The applicant will conduct monitoring of surface water in a manner approved by <br />the Division. The monitoring plan was submitted under 2.05.6(3)(b)(iv) and <br />includes the following; NPDES discharges at the three ponds (which rarely, if ever, <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.