My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-26_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-10-26_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 12:39:08 PM
Creation date
10/27/2020 12:31:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
10/26/2020
Doc Name Note
For SL19
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vegetation Cover <br />The Colowyo Mine uses two reference areas for the comparison of success of their SL-19 <br />reclamation parcels. The reference areas are the sagebrush reference area and the mountain shrub <br />reference area. Success standards are based on weighted average of the pre -mining vegetation <br />communities in each reclamation block (as shown on Map 3 and 4 in Colowyo's PAP). <br />Permit Page 4.15-18 states that the "...herbaceous cover of the revegetated area will be considered <br />adequate for final bond release if it is not less than 90% of the herbaceous cover as determined from <br />the reference areas with 90% statistical confidence utilizing a standard student's statistical t-test <br />comparison of the means." <br />All reclamation parcels contained in SL-19 being requested for Phase II bond release were sampled <br />in 2019 in accordance with the vegetation monitoring plan, detailed in Volume 1, Section 4.15 in <br />the Colowyo PAP. Sample adequacy was determined using the Cochran formula. Both the <br />sampling plan and the sample adequacy determination are acceptable to the Division. Results for <br />vegetation cover for each reclamation parcel is summarized below. <br />SedimentoloQU <br />The Division reviewed the sedimentology evaluation provided in the SL-19 application. As per <br />Rule 4.15.1(2)(b), vegetation cover shall be capable of stabilizing the soil surface to achieve erosion <br />control equal to pre -mining levels. To demonstrate this, Colowyo provided estimation on soil loss <br />based upon post -mining site specific data using the Revised Universal Soil Loss Equation <br />(RUSLE). Results from the RUSLE were then compared to baseline data from associated slopes to <br />the reclamation blocks being requested for Phase II bond release. For SL-19, there was a total of 3 <br />slopes associated with the SL-19 reclamation blocks that were evaluated. Slopes 1 and 2 are located <br />in West Pit and Slope 3 is located in the East Pit as shown in Section III of the SL-19 application. <br />Results of this demonstration as well as vegetative cover results are summarized below. <br />Phase II Bond Release Parcel Result Summary — Cover <br />Herbaceous cover: 39.78% <br />Herbaceous cover standard (90%): 15.95% <br />The 2019 sample data successfully exceeds 90% of the herbaceous cover standard. <br />Phase II Bond Release Parcel Result Summary — Sedimentologyy <br />Post -Mining — Slope 1: 0.047 tons/acre/year <br />Pre -Mining — Slope 1: 0.488 tons/acre/year <br />The 2019 sedimentology evaluation data shows post -mining condition sediment loss to be <br />less than pre -mining conditions. <br />Post -Mining — Slope 2: 0.015 tons/acre/year <br />Proposed Decision and Findings of Compliance October 26, 2020 <br />Partial Phase II Bond Release SL-19 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.