My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-26_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2020-10-26_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 12:39:08 PM
Creation date
10/27/2020 12:31:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
10/26/2020
Doc Name Note
For SL19
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SL-18 I I 1 3/20/20 1 8/22/20 <br />See Exhibit 2A of the Colowyo Mine Annual Reclamation Report for the locations of the previous <br />Phase I, H and III Bond Releases areas at the Colowyo Mine. See Table 1 in this document for the <br />previous bond release acreages and Table 2 in this document for the previous bond release amounts. <br />SL-19 Partial Phase II Bond Release Application <br />The SL-19 application was received by the Division on July 22, 2020 and deemed complete on <br />August 12, 2020. Colowyo published notice of the bond release application in the Craig Daily <br />Press once weekly for four consecutive weeks, beginning July 17, 2020 and ending on August 7, <br />2020. Colowyo notified land owners within and adjacent to the mine permit area, the Office of <br />Surface Mining (OSM), the BLM, Colorado State Land Board (CSLB) and other interested parties <br />of the application for bond release, as required by Rule 3.03.2(1). No comments, written objections <br />or requests for an informal conference regarding the bond release application were received by the <br />Division. <br />A bond release inspection was scheduled and conducted on September 2, 2020. The site inspection <br />was conducted in accordance with Rule 3.03.2(2). Inspection attendees included: Zach Trujillo of <br />the Division, Tony Tennyson of Tri-State Generation and Transmission Association, Inc. (Tri- <br />State), and Tom Medlin of OSM. No representatives from the BLM, the CLSB, other State or <br />local agencies, or adjacent land owners attended the inspection. A summary of the bond release <br />inspection is presented in Section IV, of this document. Detailed observations of the inspection are <br />documented in the inspection report that was issued September 4, 2020. See Figure 1 of this <br />document for the location of the SL-19 partial phase II bond release area. <br />III. CRITERIA FOR BOND RELEASE <br />Phase II Bond Release <br />Proposed Decision and Findings of Compliance October 26, 2020 <br />Partial Phase II Bond Release SL-19 Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.