Laserfiche WebLink
Table 3. SL-19 Releasable Amount <br />Task Phase I <br />Cost <br />EP059 - Phase I Released (SL-11) <br />$ <br />68,786.00 <br />EP060 - Phase I Released (SL-13) <br />$ <br />2,206.00 <br />Haul and Replace Topsoil to East Pit <br />$ <br />48,976.00 <br />Reseed 35.8 Acres in the East Pit <br />$ <br />20,196.00 <br />WP021 - Phase I Released (SL-9) <br />$ <br />347,500.00 <br />WP022 - Phase I Released (SL-13) <br />$ <br />183.00 <br />WP023 - Phase I Released (SL-11) <br />$ <br />282,148.00 <br />WP024 - Phase I Released (SL-13) <br />$ <br />237,560.00 <br />WP025 - Phase I Released (SL-6) <br />$ <br />104,901.00 <br />Haul and Replace Topsoil to West Pit <br />$ <br />272,243.00 <br />Reseed 199 Acres in the West Pit <br />$ <br />112,265.00 <br />GFO1 - Phase I Released (SL-13) <br />$ <br />70,290.00 <br />Haul Topsoil from Pile 17A to Admin Building (GFO1) <br />$ <br />3,078.00 <br />Regrade Topsoil at Admin Building (GFO1) <br />$ <br />1,257.00 <br />Reseed 3.4 Acres in GFO1 <br />$ <br />1,918.00 <br />Weed Control - 10% of Reseeded Areas Four Times <br />$ <br />18,465.00 <br />Subtotal of direct costs (rounded to nearest dollar) <br />$ <br />1,591,972.00 <br />Indirect Costs (rounded to nearest dollar) <br />$ <br />317,130.00 <br />Total Amount <br />$ <br />1,909,102.00 <br />25% of Total Amount (Phase II) <br />$ <br />477,276.00 <br />Proposed Decision and Findings of Compliance October 26, 2020 <br />Partial Phase II Bond Release SL-19 Page 11 <br />