Laserfiche WebLink
Mining will take place in Area 1 and 2 simultaneously, as Area 1 overburden will be needed to <br /> backfilled Area 2. Area 2 mining may begin prior to mining of Area 1 in order to create room for <br /> backfill material from Area 1. <br /> 1_3 Equipment <br /> Table D-1 shows the type of equipment that will be used for the operations of this site. Once <br /> operations are complete, all equipment will be removed from the site. <br /> 23 114 West <br /> October 2020 D-3 <br />