My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-27_REVISION - C1981019 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2020-10-27_REVISION - C1981019 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 12:20:34 PM
Creation date
10/27/2020 7:58:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
10/27/2020
Doc Name
Notice of Proposed Decision
From
DRMS
To
Jerod Smith -Colorado State Land Board
Type & Sequence
SL19
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3. SL-19 Releasable Amount <br />Task Phase I <br />Cost <br />EP059 - Phase I Released (SL-11) <br />$ <br />68,786.00 <br />EP060 - Phase I Released (SL-13) <br />$ <br />2,206.00 <br />Haul and Replace Topsoil to East Pit <br />$ <br />48,976.00 <br />Reseed 35.8 Acres in the East Pit <br />$ <br />20,196.00 <br />WP021 - Phase I Released (SL-9) <br />$ <br />347,500.00 <br />WP022 - Phase I Released (SL-13) <br />$ <br />183.00 <br />WP023 - Phase I Released (SL-11) <br />$ <br />282,148.00 <br />WP024 - Phase I Released (SL-13) <br />$ <br />237,560.00 <br />WP025 - Phase I Released (SL-6) <br />$ <br />104,901.00 <br />Haul and Replace Topsoil to West Pit <br />$ <br />272,243.00 <br />Reseed 199 Acres in the West Pit <br />$ <br />112,265.00 <br />GFO1 - Phase I Released (SL-13) <br />$ <br />70,290.00 <br />Haul Topsoil from Pile 17A to Admin Building (GFO1) <br />$ <br />3,078.00 <br />Regrade Topsoil at Admin Building (GFO1) <br />$ <br />1,257.00 <br />Reseed 3.4 Acres in GFO1 <br />$ <br />1,918.00 <br />Weed Control - 10% of Reseeded Areas Four Times <br />$ <br />18,465.00 <br />Subtotal of direct costs (rounded to nearest dollar) <br />$ <br />1,591,972.00 <br />Indirect Costs (rounded to nearest dollar) <br />$ <br />317,130.00 <br />Total Amount <br />$ <br />1,909,102.00 <br />25% of Total Amount (Phase II) <br />$ <br />477,276.00 <br />Proposed Decision and Findings of Compliance October 26, 2020 <br />Partial Phase II Bond Release SL-19 Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.