My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-23_REVISION - M1991037
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991037
>
2020-10-23_REVISION - M1991037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 8:41:29 AM
Creation date
10/26/2020 8:18:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991037
IBM Index Class Name
Revision
Doc Date
10/23/2020
Doc Name
Adequacy Review Response
From
Ben Langenfeld - Greg Lewicki & Associates, PLLC
To
DRMS
Type & Sequence
TR11
Email Name
ERR
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: 'DRMS Den Page 2 of 2 2020-10-23 21.01.37 (GMT) 13032008630 From Ben Langenfeld <br />Greg Lewickiiknd Associates., PLIA(-"' <br />.Ys}em'1���. a,��'#'i.➢": `�"3€`a`�t; k"�'.>ti'#€,: .,:<@�4��i:�;�:tx� s<aki?{b.`"),-�.bfr{i^;,r�r <br />Uulr a n. €..0 U1.2c. <br />October 23, 2020 <br />Elliott Russell <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman St, Rm 215 <br />Denver, CO 80203 <br />RE: Fairplay An Pit, M-1991-037 <br />Technical Revision TR-11 <br />Adequacy Response <br />In response to the Division's letter dated October 15, 2020, here is a summary of the changes <br />being made to the mining and reclamation plans at the f airplay Au Pit. <br />I. The powerpole and powerlines that had previously been between Phases IA/B and <br />Phases 2/3 has been removed. The mining and reclamation plan maps now reflect this <br />change. A revised bond calculation and Exhibit L were generated to reflect this change. <br />2. With the approval of'IR-10, the landowner will be moving the onsite water ditch to the <br />south. This change means a distinction between Phase I A and Phase I B will no longer be <br />needed. Mining and reclamation documents now reflect this. <br />It should be noted that other components of the mining and reclamation plans, such as setbacks <br />and post mining land use, are not affected by the proposed technical revision 11. <br />Please contact me with any further questions. <br />Regards, <br />Ben Langenfeld, P.E. <br />Greg Levvicki and Associates <br />Fair ploy Au 77t <br />
The URL can be used to link to this page
Your browser does not support the video tag.