Laserfiche WebLink
PUBLIC NOTICE <br />Hayden Gulch Terminal, LLC, 29515 Routt County Road 27, Oak Creek, Colorado 80467, has requested <br />Phase I, II and III release of 170.3 acres of its reclaimed lands at the Hayden Gulch Loadout (CDRMS <br />Permit No. C 1992-081, approved May 22, 1993). <br />The Hayden Gulch Loadout is located approximately 1.5 miles south of the Town of Hayden, <br />Colorado. The specific area to which this bond release request applies within the Permit Area is <br />located as follows: <br />Section 10 — Portions of: SENE, NESE, and SESE <br />Section 14 —Portions of: NWNW, SWN W, SENW, AND SW '/4 <br />Section 15 — Portions of: NENE <br />The Hayden Gulch Loadout permit area consist of 391 acres. The USGS 7.5 Minute Quadrangle Maps Mount <br />Harris, Colorado contains the described affected area. Pursuant to Rule 3.03.1, a permittee may request <br />Bond Release upon completion of all surface mining operations in accordance with the approved <br />reclamation plan, and the final inspection and procedures of Rule 3.03.2 have been satisfied. The <br />approved reclamation plan can be viewed in its entirety in the Hayden Gulch Loadout Permit <br />Application Package located at the Foidel Creek Mine Office, 29515 RCR 27, Oak Creek, Colorado <br />80467. Two Corporate Surety Bonds totaling $1,107,240.91 are currently in place of which the bond <br />amount to be released by this request will be determined by the Colorado Division of Reclamation, <br />Mining and Safety. <br />A copy of the SL-2 bond release application is available for public inspection at the Foidel Creek Mine Office, <br />29515 Routt County Road 27, Oak Creek, Colorado 80467. Written comments or objections or requests for <br />public hearing or informal conference concerning this application may be submitted to, and additional <br />information obtained from, the Colorado Division of Reclamation, Mining and Safety, 1313 Sherman Street, <br />Room 215, Denver, Colorado 80203-2273, (303) 866-3567. Comments must be received within 30 days of <br />the last publication of this notice or within 30 days of the onsite inspection, whichever is later. <br />Hayden Gulch Bond Release <br />