My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-16_REVISION - M1977141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977141
>
2020-10-16_REVISION - M1977141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:46 PM
Creation date
10/19/2020 9:32:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Revision
Doc Date
10/16/2020
Doc Name
Request for Technical Revision
From
Aggregate Industries-WCR, Inc.
To
DRMS
Type & Sequence
TR5
Email Name
AME
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Complied: y1oklTiolls <br /> %r $ COLORA "irm � ` INING AND SAFETY <br /> * 131: Oq 03)866-3567 <br /> `11S _-�1.TE,niac <br /> RECEIVED <br /> till �-1=11 <br /> REQUEST' FOR TECHNICAL REVISION JR) COVER SHEET CI 6 Z0ZO <br /> File No.: M- 1977-141 Site Name:Lyons Quarry DIVISION OF RECLAMATION <br /> SAFETY <br /> County Boulder TR# ORMS Use only) <br /> Permittee:Aggregate Industries-MR, Inc. <br /> Operator(If Other than Permittee):Same <br /> Permittee Representative:Jeremy Deuto <br /> Please provide a brief description of the proposed revision: <br /> Update to reclamation plan for floodplain area. <br /> As defined by the Minerals Rules,a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Divisiori must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction ❑ <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(l,2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.