Laserfiche WebLink
Page 9 of 20 <br />TRUCK/LOADER TEAM WORK <br />Task description: Backfdl and Grading J Pit East <br />Site: Trapper Mine Permit Action: PR10 <br />PROJECT IDENTIFICATION <br />Task #: NO2 State: Colorado <br />Date: 9/23/2020 County: Moffat <br />User: RAR <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: KOMATSU 830E <br />-Loader: CAT 6090 <br />Permit/Job#: C1981010 <br />Abbreviation: None <br />Filename: PR10 <br />Shift basis: 1 per day <br />Support Equipment -Load Area: <br />Cat D10T - IOSU <br />-Dump Area: <br />Cat D10T - IOSU <br />Road Maintenance -Motor Grader: <br />CAT 16M <br />-Water Truck: <br />Water Tanker, 14,000 Gal. <br />Cost Breakdown: Truck/Loader Team Support Eauipment Maintenance Eauipment <br />Truck <br />Shovel <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />25 <br />25 <br />25 <br />25 <br />Ownership cost/hour: <br />$197.30 <br />$23.07 <br />$170.04 <br />$170.04 <br />$55.79 <br />$90.47 <br />Operating cost/hour: <br />$220.67 <br />$930.15 <br />$38.26 <br />$38.26 <br />$15.02 <br />$33.68 <br />%Utilization -riper: <br />NA <br />0 <br />15 <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />$22.66 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$1.97 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$34.42 <br />$37.32 <br />$41.30 <br />$41.30 <br />$28.56 <br />$0.00 <br />Unit Subtotals: <br />$452.39 <br />$990.54 <br />$251.56 <br />$249.59 <br />$99.37 <br />$124.15 <br />Number of Units: <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $2,347.71 <br />Support: $501.15 <br />Maint: $223.52 <br />Total work team cost/hour: $3,072.38 <br />MATERIAL OUANTITIES <br />Initial volume: 589,950 CCY Swell factor: <br />Loose volume: 589,950 LCY <br />Source of estimated volume: Appendix A Tables A-2A-3.1 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />