Laserfiche WebLink
Page 6 of 20 <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />1,400.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push -5 % <br />gradient: <br />Average site altitude: 6,413 feet <br />Material weight: 2,475 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Adjusted unit <br />production: <br />Adjusted fleet <br />production: <br />Sonrce <br />1.000 <br />(EXCL.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.790 <br />(3 SHIFTS/DAY) <br />0.900 <br />(SSD-FC) <br />1.115 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.929 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.6628 <br />JOB TIME AND COST <br />927.92 LCY/hr <br />3711.68 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.290/LCY <br />Total job time: 0.19 Hours <br />Total job cost: $203 <br />CIRCES Cost Estimating Software <br />